[email protected]
9
02_IN.Palmo_00 191203
9
u.m.=m
0.00
0.00
+ 0.02
P.02
+ 0.02
P.02
u.m.=m
+ 0.00
+ 0.00
+ 0.02
GBR
N.B. Make the connection
N.B.:
Remove the protections of
polystyrene from the runner
Make sure that the concrete is solidifi ed before to insert the extractable structure.