9
MATERIALS
Tissue
(PORCHER SPORT, Rue du Ruisseau B.P. 710,38290 ST. QUENTIN FALLAVIER, FRANCE)
Top Sail - Leading Edge - SKYTEX 38 E25A - 100% nylon 6.6 , 33 Dtex, 38 g/m
2
Top Sail - Trailing Edge - SKYTEX 38 E25A - 100% nylon 6.6 , 33 Dtex, 38 g/m
2
Bottom Sail - SKYTEX 38 E25A - 100% nylon 6.6 , 33 Dtex, 38 g/m
2
Main ribs, Diagonals - SKYTEX 40 E29A - 100% nylon 6.6 , 33 Dtex, 40 g/m
2
Ribs - SKYTEX 38 E25A - 100% nylon 6.6 , 33 Dtex, 38 g/m
2
Reinforcement Main Ribs - Grille Polyester 200 g/m
2
Reinforcement Ribs - W382 Polyester 180 g/m
2
Lines
(CO. Achener Weg 66, D-88316 ISNY IM ALLGEAU, GERMANY)
Stabilzer cascade - Aramid/Polyester A-6843-060, Breaking Load 60 kg
Upper cascade A,B,C,D - Aramid/Polyester A-6843-080, Breaking Load 80 kg
Upper cascade A,B - Aramid/Polyester A-7343-140, Breaking Load 140 kg
Middle cascade D - Aramid/Polyester A-6843-080, Breaking Load 80 kg
Main lines A1,B1,C1,D2,D3 - Aramid/Polyester A-7343-280, Breaking Load 280 g
Main lines2,A3,B2,B3 - Aramid/Polyester A-7343-420, Breaking Load 420 kg
Main lines D1,D2,D3 - Aramid/Polyester A-7343-190, Breaking Load 190 kg
Stabilzer line - Aramid/Polyester A-7343-140, Breaking Load 140 kg
Brake lines upper cascade - Dynema/Polyester A-7850-100, Breaking Load 100 kg
Brake lines middle cascade - Dynema/Polyester A-7850-130, Breaking Load 130 kg
Main Brake Line - Dynema/Polyester A-7850-360, Breaking Load 360 kg
(Cousin Trestec, Comines CEDEX, France)
Upper cascade D - Vectran – 0,9mm Bruchlast 90 kg
Upper cascade E - Vectran – 0,6mm Bruchlast 45 kg
Attachment straps
(STAP a.s., 407 80 VILEMOV, CZECH REPUBLIC)
STAP-POLYESTERBRIDLE 13 mm, Breaking Load 70 kg
Risers
(MOUKA TISNOV ltd, Koráb 133, 66601 Tišnov, Czech Republic)
Polyester 367 040 025 912 25x1,5 mm Breaking Load 800 kg
Thread
(AMANN SPONIT ltd, Dobronická 635, 148 25 PRAHA 4, CZECH REPUBLIC)
Lines-SYNTON 60, Main lines-SERABOND 60, Canopy-SYNTON 40, Riser-SYNTON 30
Rapid links
(ELAIR SERVIS, CZECH REPUBLIC)
NIRO TRIANGLE 200 - Max. Load 200 kg
Summary of Contents for Pasha 5
Page 1: ......
Page 25: ...25 LINE PLAN PASHA 5 ...
Page 29: ...29 ...
Page 30: ...30 CHECKS Name Company Date Signature Stamp ...
Page 32: ...32 ...