15
Then we must move the left (blue
arrow) panels over to the right ones
(green arrow).
All panels are now right.
Same like we did with the right side
panels now the left ones with the blue
arrow must be placed according to the
same procedure as the right side, clean
and wrinkle-free. Beginning with the
first at the bottom.
Same as on the right side with the
green arrows the panels are defined
with the blue arrows. There are three
rectangular panels before the lateral
corner panel. It should be noted that
the lines must be located in the
centre of the base bellow. Here you
a can help yourself with sand bags.
NOTE: The Aegis SQ 105 has
three panels and the Aegis SQ 140
has four panels.