Procedure sheet.

IN

Creation Date :1/11/2012

Sheet No.

                           

 of 

91326

Step 2b) With both shelf assemblies fitted.
Secure the 

UPPER

 chassis assembly into place first.

This can be secured to the shelf via the feet holes

removed in step 1a.
The 4 hole positions in the shelf are shown below.

Step 3) Attach the Dual Tier SCOUT Receiver to the flange plates.

Dual Tier SCOUT Receiver

# 561605

4

Front of

shelf.

1

2

3

4

With the upper chassis secured in place repeat Step 2b for the 

LOWER

 chassis assembly.

Summary of Contents for Dual SCOUT

Page 1: ...ion IN91316 available on website 19 Rack with 12U of clear space PXI Chassis x 2 Pickering 40 923 001 Flange kit x 2 561635 Step 1a Remove feet and handles from both sides and bottom of the chassis Step 1b Using the screws provided with the flange kit Secure both left and right flange plates to the side of the chassis Note the two holes close together go to the bottom 4 Bottom feet removed Handle ...

Page 2: ...e shelves into the 19 rack using Instruction sheet IN91316 for guidence this is available from the MAC Panel website under P N s 561265 561252 561253 Upper slide shelf 561638 Lower slide shelf 561637 12U clear space in rack U1 U5 U6 U11 U12 Shelf Assemblies need to be mounted in the shown positions Upper assembly should overlap U5 and U6 Lower assembly should overlap U11 and U12 4 ...

Page 3: ...to place first This can be secured to the shelf via the feet holes removed in step 1a The 4 hole positions in the shelf are shown below Step 3 Attach the Dual Tier SCOUT Receiver to the flange plates Dual Tier SCOUT Receiver 561605 4 Front of shelf 1 2 3 4 With the upper chassis secured in place repeat Step 2b for the LOWER chassis assembly ...

Page 4: ...ange kits secure the Dual Tier SCOUT Receiver to the Flange plates TWO PEOPLE REQUIRED TO CARRY OUT THIS OPERATION 4 3 x 6 32UNC Screw same both sides Shelves and rack removed for clarity Step 3b Slide the whole assembly back into the 19 rack and secure using the long fixing screws in the receiver The Dual Tier SCOUT Receiver and both Chassis are now accurately aligned and ready for use ...

Reviews: