Instruc tio n Ma nua l
MAN-086
15
w w w .m a c m e d ic a l.c o m
INSTALLATIO N INSTRUC TIO NS - O p tio na l Wa ll Mo unte d O p e ra ting Ro o m C a b ine ts w ith se p a ra te Ba se s (c o nt.)
5. Pla c e the c a b ine t c a re fully o n the b a se (Fig . 13).
6. Se c ure the c a b ine t to the b a se using the Lo c king
He x Bo lts a nd Fla ng e d He x Nuts (p ro vid e d ) in the six
ho le s o n the sid e s o f the b a se a nd c a b ine t (Fig . 14).
7. Re p la c e b o tto m p a ne l o f the c a b ine t.
8. To furthe r se c ure the c a b ine t, ho le s m a y b e d rille d in the
b a c k o f the c a b ine t a nd insta lle r-p ro vid e d ha rd w a re use d
to se c ure the c a b ine t to the w a ll.
9. If the c a b ine t is e q uip e d w ith she lving p ro c e e d to the
She lf Insta lla tio n
Instruc tio ns o n p a g e 18.
10. If the d o o rs ha ve b e e n re m o ve d , re p la c e the d o o rs b y
a lig ning the hing e s a nd g e ntly lo w e ring the d o o r into the
hing e s. The p in o n the hing e o f the d o o r w ill inse rt into
the b a rre l o f the hing e o n the c a b ine t.
Fig . 14: Atta c h b a se a nd c a b ine t
Fig . 13: Mo unt C a b ine t to Ba se