90
outdoor unit installation
2. Install and fix the outdoor unit. Fix with bolts and nuts tightly on
a flat and strong floor.
If installed on a wall or roof, make sure the support structure is
firmly fixed to prevent it from shaking due to vibration or strong
wind.
3. Outdoor unit piping connection.
• Remove valve caps from the 2-way and 3-way valves.
• Connect the pipes to the 2-way and 3-way valves separately ac-
cording to the required torque.
4. Outdoor unit cable connection: See previous page.
Drain port
Washer
Drain hose
(prepared by user)
Rubber pad (optional)
Place under the
leg pedestal
1. Install drain port and drain hose (on heat-pump models only).
Condensation water drains from the outdoor unit when the unit
operates in heating mode. In order to not disturb your neighbors
and protect the environment, install the drain port and a drain
hose to direct the condensation water. Install the drain port and
rubber washer to the chassis of the outdoor unit, then connect a
drain hose to the port as shown in the illustration.
• Overheat protection or high pressure protection cable (it is an op-
tional part).
After connection, the ionizer will work automatically.
• Ionizer (this is an optional part).
After connection, the wire should be well wrapped using a wrap-
ping tape, and the connector should be placed inside the unit.
Wire
(indoor)
Sensor
(outdoor)
Ionizer wire
(indoor)
Summary of Contents for MMT09CABWCCCHI8
Page 2: ...2 ...
Page 54: ...54 ...
Page 105: ...105 notas notes ...
Page 106: ...106 notas notes ...
Page 111: ...111 ...
Page 112: ...112 ...