background image

TOOL REQUIRED FOR ASSEMBLY: screwdriver, 11/32 nut driver or wrench, 7/16” and 1/2” socket or end 

wrenches, measuring tape. 

 

1.  Assemble the boom using 8-32 screws and locknuts to join sections. ( SEE BOOM LAYOUT PAGE). 
 

ASSEMBLING THE HORIZONTAL ELEMENTS 

2.  Lay out the elements by “Horizontal” length and position as shown the DIMENSION SHEET. Start with the 

reflector (longest) element. Balance it on your finger to find rough center and push on a black button insulator 
to about 1/2” off center. Push the element through the hole on the boom and install the second button, 
snugging it up into boom. DO NOT BOTHER CENTERING the element at this time and DO NOT INSTALL 
the stainless steel shaft retainers yet. It is easier to do it after all the horizontal elements are installed in the 
boom. 

 

3.  Install the 3/16” rod DRIVEN ELEMENT as you did the reflector. Then continue with the installation of the 

DIRECTORS. 

Note: the Director Elements do not consistently diminish in length from rear to front, so pay 

close attention to length and position.  

 

4.  Now begin centering the elements. Use a tape measure to EQUALIZE the amount the element sticking out 

on each side of the boom. Once you have all the elements centered, sight down the element tips from the 
rear comparing each side. Look for any obvious discrepancies and correct if found. 

 

5.  Stainless steel SHAFT RETAINERS lock the elements in place. They should always be used for permanent 

and long term antenna installations. For portable or temporary use, the button insulators are adequate for 
holding the elements and the retainers may be left off.  

 

To install the stainless steel SHAFT RETAINERS, use thumb and forefinger to hold the retainer over the end 
of the PUSH TUBE ( 3/8" x 3" tube, supplied in the kit), internal fingers on retainer dished into tube. HOLD 
THE ELEMENT FIRMLY TO PREVENT IT FROM SLIDING OFF CENTER and press the retainer onto the 
element end and continue until retainer butts on insulator button. Locking pliers, 

lightly

 clamped up against 

opposite button insulator will help maintain center reference (if you push the first retainer too far, remove 
element from boom, push retainer completely off 
the element, and start over). Install another 
retainer to the opposite side of the element.  
Continue installing retainers until all elements 
are secured. 

 

6. Mount the 

HORIZONTAL

 DRIVEN ELEMENT 

ROD ASSEMBLY to the

 TOP

 of the boom using 

a single 8-32 X 1-1/4" screw (SEE PICTURE). 

 

7.  Install the 8-32 x 1/4” set screws (internal Allen 

head - tool supplied) into the SHORTING BARS. 
Slide the bars onto the Driven Element Block 
Rods and the 3/16" driven element rods. 

Position the Shorting Bars as shown on 
dimension sheet. 

 

 

ASSEMBLING THE VERTICAL ELEMENTS 
 

Note: The vertical element set is shifted forward on the boom by 1/4 wave lengths. This increases isolation 
between element planes, improving circularity and ease of phasing / matching the two element sets. 

8.  Repeat steps #2 through #5 for the Vertical elements, using the Dimension Sheet as your guide to lengths 

and spacing. 

 
 

INSTALLATION OF THE VERTICAL DRIVEN ELEMENT BLOCK DETERMINES THE CIRCULARITY OF 
THIS ANTENNA. THE ORIENTATION OF THE BLOCK FOR RHC - RIGHT HAND CIRCULARITY, IS 
SHOWN ON THE DIMENSION SHEET. 

  

9.  Viewed from the rear of the boom (rearmost Reflector HORIZONTAL), the VERTICAL Driven Element Block 

mounts to the LEFT hand side of the boom with the two Balun connectors oriented to the REAR. Secure with 
8-32 x 1-1/4” screw. Install the Shorting Bars as in step #7.  

370CP38 ASSEMBLY MANUAL 

Summary of Contents for 370CP38

Page 1: ...circular polarized antenna with a remarkably clean pattern The pattern is important in order to match the antenna s noise temperature with modern low noise preamps This antenna is ideal for satellite work but is also excellent for terrestrial uses like long haul tropo communications The CNC machined driven element module is O ring sealed and weather tight for low maintenance and long term peak per...

Page 2: ...nd forefinger to hold the retainer over the end of the PUSH TUBE 3 8 x 3 tube supplied in the kit internal fingers on retainer dished into tube HOLD THE ELEMENT FIRMLY TO PREVENT IT FROM SLIDING OFF CENTER and press the retainer onto the element end and continue until retainer butts on insulator button Locking pliers lightly clamped up against opposite button insulator will help maintain center re...

Page 3: ... The boom to mast plate is normally mounted to the boom at the balance point Since the feed line represents significant weight it is best to have it attached and fastened to the boom with cable ties before final mounting the plate Use two 1 U bolts and the stainless nuts and lock washers provided DO NOT OVER TIGHTEN 2 U bolts and stainless steel nuts lockwashers are provided for mounting the anten...

Page 4: ...370CP38 BOOM LAYOUT REAR OF ANTENNA FRONT OF ANTENNA ...

Page 5: ...370CP38 DIMENSION SHEET ...

Page 6: ...OTE INSTALLATION OF THE D E BLOCKS DETERMINES THE CIRCULARITY OF THIS ANTENNA THE ORIENTATION OF THE BLOCKS FOR RHC RIGHT HAND CIRCULARITY IS SHOWN BELOW ON THE DIMENSION SHEET FOR LHC LEFT HAND CIRCULARITY SIMPLY REVERSE ONLY ONE OF TWO D E BLOCKS TO THE OPPISITE SIDE OF THE BOOM DO NOT TO REVERSE THE DIRECTIONS OF THE BALUNS ...

Page 7: ...POLARITY SWITCH OPTION DETAILS REAR OF ANTENNA JUNCTION BLOCK HORIZONTAL D E P S VERTICAL D E BALUN BALUN RG 6 3 4 RG 6 1 4 ...

Page 8: ...370CP38 VSWR ...

Page 9: ...G BAR 1 4 X 3 4 M2ASB0080 4 U BOLT CRADLE 2 2 U BOLT 1 5 2 PENETROX ZINC PASTE CUP 1 ASSEMBLY MANUAL 1 HARDWARE BUTTON INSULATORS 76 SHAFT RETAINER SS 76 NUT 5 16 18 SS 8 LOCKWASHER 5 16 SS 8 SCREW 8 32 X 1 3 4 SS 4 SCREW 8 32 X 1 1 2 SS 4 SCREW 8 32 X 1 1 4 SS 3 LOCKNUT 8 32 SS 8 SETSCREW 8 32 X 1 4 SS 8 CABLE TIE 8 NYLON 4 SEAL NUTS 3 8 32 8 ALLEN HEAD WRENCH 5 64 1 PUSH TUBE 3 8 X 3 1 POLARITY ...

Reviews: