M2 Antenna Systems 6M6LN Manual Download Page 7

6M6LN STACKING INFORMATION 

 

INSTALLATION AND STACKING INFORMATION

 

 
 

A

. A mast or cross boom that is mounted to the boom 

in  the  element  plane

 must be non

-

 con-

ductive (fiberglass, etc.). 

 

 

 

 

B

.  To  protect  your  investment  in this  high  performance  antenna,  always  use  high  quality  coax 

and connectors. Old, corroded, or poor quality materials are common sources of 

serious

 perfor-

mance losses. 

 

 
 

C

. If possible, test the antenna, connectors and feedline BEFORE installing to your mast or tow-

er. Set antenna on a tall (non

-

metallic) ladder or temporary mast. Check for continuity and match 

across the bandwidth. It should be similar to rated specifications.

 

 

 

 

D.

 STACKING REMINDERS:

 

 

 

1. All driven element blocks MUST be oriented to the same side of boom.  On models with                                      

 

    ferrite baluns, the red leads must connect to the same side of each driven element.

 

 

 

2. All boom

-

to

-

mast plates MUST be mounted at the same side and location on the boom.

 

 

 

3.  Feed  /  phasing  lines MUST  be  of  equal  electrical  length or multiples of  1 wavelength in 

 

    order  to maintain  equal  phasing  in  the  array.  Improper  phasing  can  severely  deteriorate     

 

    performance.

 

 

 

4. If you are unsure about stacking multiple antennas, please call 

M

2

 

and let us help you DO 

 

    IT RIGHT.

 

 

 
 
 
 

T

HIS COMPLETES THE ANTENNA ASSEMBLY.

 

 

Carefully manufactured by:

 

M

2

 ANTENNA SYSTEMS, INC.

 

4402 N. Selland Ave.

 

Fresno, CA 93722

 

(559) 432

-

8873  Fax: 432

-

3059

 

www.m2inc.com

 Email: 

[email protected]

 

Summary of Contents for 6M6LN

Page 1: ...p Wt 18 Lbs 20 Lbs M2 Antenna Systems Inc Model No 6M6LN SPECIFICATIONS Subtract 2 14 from dBi for dBd Referenced at a 40 install height FEATURES The 6M6LN is M2 Antenna Systems newest 6M Yagi The des...

Page 2: ...6M6LN ANTENNA OVERVIEW REFLECTOR ELEMENT BOOM ASSEMBLY TRUSS SUPPORT ASSEMBLY MAST SUPPLIED BY CUSTOMER DRIVEN ELEMENT D1 ELEMENT HAIRPIN ASSEMBLY D2 ELEMENT D3 ELEMENT D4 ELEMENT...

Page 3: ...6M6LN DIMENSION SHEET...

Page 4: ...32 5 from the rear of the boom to the inside face of the DRIVEN ELEMENT CLAMP Tighten DRIVEN ELEMENT CLAMP into proper position STEP 2 Using the DIMENSION SHEET as reference insert the SUPPORT RODS in...

Page 5: ...ELEMENT HALF and FIBERGLASS INSULATOR Tighten screw with LOCKNUT STEP 6 Using DIMENSION SHEET locate final position of HAIRPIN Set into position with SET SCREW STEP 7 Insert a nut into the center of t...

Page 6: ...TURNBUCKLE Secure the DACRON ROPE to the REAR TURNBUCKLE using the same method used to attach to EYEBOLT Cut the remaining rope to use for the FRONT EYEBOLT STEP 12 Repeat previous step for the front...

Page 7: ...should be similar to rated specifications D STACKING REMINDERS 1 All driven element blocks MUST be oriented to the same side of boom On models with ferrite baluns the red leads must connect to the sam...

Page 8: ...SSION CLAMP 500 M2AMC0146 2 BALUN 1 1 WITH SO239 CONNECTOR FGBL0700 1 DACRON ROPE 3 16 x 20 1 BOOM TO MAST PLATE 4 X 6 X 188 M2APT0022 1 TURNBUCKLE PLATE 2 X 4 X 125 M2APT0102 1 BALUN PLATE 1 5 X 3 X...

Reviews: