background image

222XP40 ASSEMBLY MANUAL 

1/2” end wrench).  Secure the balun close to the boom with a nylon cable tie in such a way so that 
it’s snug but not crushing or kinking the coax.  

 
9.  Install the 8-32 x 1/4” set screws (internal Allen head - tool supplied) into the four SHORTING 

BARS.  Slide the bars onto the 3/16” rod driven element tips and then onto the Driven Element 
Block Rods.  Position the Shorting Bars as specified on the DIMENSION SHEET: the distance 
given is between the outer edge of the Driven Element Block and the inner edge of the Shorting 
Bar.  Align the bars and rods with each other and tighten the setscrews. 

 
10.  If you have not already done so, attach the boom to mast plate to the boom.  It is normally 

mounted at the balance point, as shown on the DIMENSION SHEET. Use two 1-1/2" U-bolts and 
the stainless nuts and lock washers provided. DO NOT OVER TIGHTEN.  2” U-bolts are provided 
for mounting the antenna to your 

NON-CONDUCTIVE

 mast. 

 
 

“XP” Yagis require the coax cables exit the boom just at the rear reflector and at right angle to the 
rear reflector. When mounting two antennas side by side the rear reflectors must be vertical so the 
cables can exit the boom horizontally. M2 offers a ’T’ brace kit for two or more antenna arrays. It 
supports the cables from each XP Yagi and routes the cables back to the main crossboom. The two 
phasing or feed line represents significant weight it is best to have them, or a temporary equivalent, 
attached and hanging from the rear of the boom when positioning the boom to mast plate.  

 
11.  OVERHEAD GUY SYSTEM 
 

Locate the 3/8 x 24” fiberglass rod, the three fiberglass rod mast clamp blocks, the fiberglass mast 
clamp flag and the remaining four 8-32 x 1-1/4” screws and locknuts.  Attach two fiberglass rod 
mast clamp blocks to the boom to mast plate with two 8-32 x 1-1/4” screws and locknuts as shown 
below in the figure.  Insert the 3/8 x 14” fiberglass rod into the slot formed by the two blocks and 
tighten the two locknuts.  Now assemble the remaining fiberglass rod mast clamp and mast clamp 
flag with two 8-32 x 1-1/4” screws and locknuts.  Slide the assembly onto the fiberglass rod as 
shown below in the figure and tighten the two screws.   

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for 222XP40

Page 1: ... gain and patterns in both the horizontal and vertical planes The vertical elements have been shifted 4 in front of the horizontal set to allow circular polarization if needed This means four possible polarization modes with one antenna Two antennas stacked are a great tropo and EME package and four or more are amazing allowing Even small Yagi EME contacts using CW or JT65B Structurally the 222XP4...

Page 2: ...nts Use a tape measure to EQUALIZE the amount the element sticking out on each side of the boom Once you have all the elements centered sight down the element tips from the rear comparing each side Look for any obvious discrepancies and correct if found 5 Begin installing the stainless keepers Use thumb and index finger to hold a keeper over end of the 3 8 x 3 push tube keeper dished into tube Hol...

Page 3: ...t at the rear reflector and at right angle to the rear reflector When mounting two antennas side by side the rear reflectors must be vertical so the cables can exit the boom horizontally M2 offers a T brace kit for two or more antenna arrays It supports the cables from each XP Yagi and routes the cables back to the main crossboom The two phasing or feed line represents significant weight it is bes...

Page 4: ...t just costs more 14 MOUNTING INFORMATION M2 offers 2 X 1 4 wall FIBERGLASS TUBE in various lengths and we make a wide range of H frames for both Xpol and linear Yagis MOUNTING THE 222XP40 ON A METALLIC MAST WILL GREATLY DEGRADE ITS PERFORMANCE IN THE PLANE OF THE MAST THEREFORE THE ANTENNA SHOULD BE MOUNTED ON A NON CONDUCTIVE SUPPORT EXTENDING FROM THE ANTENNA AT LEAST 36 MOUNTING THE ANTENNA WI...

Page 5: ...222XP40 DIMENSION SHEET ...

Page 6: ...30 FT 1 NYLON TIE 5 BLACK 4 ALLEN WRENCH 5 64 1 PUSH TUBE 3 8 X 3 ALUM 1 ASSEMBLY MANUAL 1 HARDWARE BAG 1 U BOLT AND CRADLE 2 2 U BOLT AND CRADLE 1 1 2 2 NUT 5 16 18 SS 4 LOCKWASHER 5 16 SPLIT RING SS 4 TURNBUCKLE 1 4 X 3 1 4 2 EYEBOLT 1 4 X 4 2 NUT 1 4 20 SS LOCKING 2 HARDWARE BAG 2 NUT SEAL 4 BUTTON INSULATOR 3 16 BLACK POLY 80 KEEPER 3 16 SS 80 SCREW 8 32 X 1 3 4 SS PHILLIPS 8 SCREW 8 32 X 1 1 ...

Reviews: