defoaming mode, the positive pressure reaches 0.6MPA, and the device
deflates when the set time is reached , the positive pressure gauge is reset to
zero, the running time is reset to zero, and the fit and defoaming are
completed.
*The defoaming time can be adjusted according to the size of the
bubbles on the screen, at least 5 to 10 minutes.
4.
devices care
Maintenance item
Precautions for maintenance
Cavity
Check whether there are sundries,
and if so, please clean them up in
time.
Equipment life
When the machine is not in use,
the power must be turned off to
make the equipment last longer
Cooling net
Regularly clean, keep clean, strictly
prohibit blockage