Connect the vacuum pump power plug and vacuum pump tube.
Press the start button, the device can start to work, the machine starts to
vacuum, runs to the set lamination time, the vacuum value jumps, at this
time the equipment starts lamination, when the set lamination time is reached,
the equipment starts to deflate, and the vacuum value returns to zero , the fit
is complete.
*Observe the vacuum value of the screen during the defoaming process, no
air leakage