background image

R7M-DC8C

5-2-55, Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
Phone: +81(6)6659-8201  Fax: +81(6)6659-8510  E-mail: [email protected]

EM-7803-U Rev.4  P. 3 / 7

WIRING INSTRUCTIONS

 

SCREW TERMINAL

Torque

: 0.5 N·m

 

SOLDERLESS TERMINAL

Refer to the drawing below for recommended ring tongue 
terminal size.  Spade tongue type is also applicable.  Solder-
less terminal:
Applicable wire size: 0.25 to 1.65 mm

2

 (AWG 22 to 16)

Recommended manufacturer: Japan Solderless Terminal 
MFG. Co., Ltd, Nichifu Co., Ltd

6 (.24) max

3.3 (.13) max

mm (inch)

CONNECTION DIAGRAM

Connect the unit as in the diagram below.

4 Points / common

10

14

1

2

5

11

+24V

Y0

0V

Y3

COM0

COM0

+

+

18

6

9

15

Y4

Y7

COM1

COM1

+

+

8 Points / common

10

14

1

2

5

11

+24V

24V DC

Y0

0V

+

Y3

15

Y4

18

Y7

COM0

COM0

6

9

COM1

COM1

+

+

24V DC

+

5

2

6

4

7

13

8

9

14

12

15

11

16

17

18

COM0

COM0

COM0

Y0

Y1

Y2

Y3

COM0

COM1

COM1

COM1

Y4

Y5

Y6

Y7

COM1

3

4

1

2

5

3

FG

6

7

24 V DC

0 V

SLD

DG

DB

DA

10

1

0 V

+24 V

■ 

Output Connection Example

In order to improve EMC performance, bond the FG
terminal to ground.
Caution: FG terminal is NOT a protective conductor terminal.

MASTER CONNECTION

 MASTER CONNECTION

Tx+/Rx+
Tx–/Rx–

SG

Rx+
Rx–

Host PC

DA
DB

DG

SLD

FG

Remote Unit

DA
DB

DG

SLD

FG

Remote Unit

TERMINATOR

TERMINATOR

Be sure to connect the terminating resistor included in the product package to the unit at both ends of transmission line.
The terminator must be connected across DA and DB.
The Host PC can be located other than at the extreme ends of transmission line.

Summary of Contents for R7M-DC8C

Page 1: ...installed such that appropriate clearance and creepage distances are maintained to con form to CE requirements Failure to observe these re quirements may invalidate the CE conformance The actual insta...

Page 2: ...s place digit of the address 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 Node Address Setting x1 Factory setting 00 Node Address Setting x10 BAUD RATE Baud Rate is selected with the rotary switch 5 4 3 2...

Page 3: ...6 9 15 Y4 Y7 COM1 COM1 8 Points common 10 14 1 2 5 11 24V 24V DC Y0 0V Y3 15 Y4 18 Y7 COM0 COM0 6 9 COM1 COM1 24V DC 5 2 6 4 7 13 8 9 14 12 15 11 16 17 18 COM0 COM0 COM0 Y0 Y1 Y2 Y3 COM0 COM1 COM1 COM...

Page 4: ...d cautions when installing R7M are stated below Use control panels with an internal panel plate both made of metal when installing the R7M Make sure to adequately ground the control panel and the inte...

Page 5: ...using an electro magnetically shielded control panel By connecting the internal panel plate and the panel cover with an earth strap grounding may be strengthened and EMC may be improved Ground the con...

Page 6: ...dditional measures may be taken depending upon actual installation sites These points of cautions are illustrated in the next page Keep cables as short as possible It prevents noise emissions from the...

Page 7: ...m is not effective Points of cautions applicable when wiring the R7M Series To external apparatus Keep the cable as short as possible To external apparatus Shielded Cable Earth Clamp Remove a part of...

Reviews: