BVS

EM-3118  Rev.4  P. 3 / 3

MG CO., LTD. www.mgco.jp

5-2-55 Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN

WIRING INSTRUCTIONS

 

SCREW TERMINAL 

Torque: 0.8 N·m

CHECKING

1) Terminal wiring:  Check that all cables are correctly con-

nected according to the connection diagram.

2) Input:  Check that the input signal is within 0 – 100% of 

full-scale.

3) Output:  Check that the load is within the permissible 

limit including wiring resistance.  

Load Resistance (Ω) = 

Supply Voltage (V) – 12 (V)

0.02 (A)

(including leadwire resistance)

4) When you check the output signal, connect an ammeter 

of which the internal resistance is of 10Ω max. to the 

monitor terminals.

ADJUSTMENT PROCEDURE

This unit is calibrated at the factory to meet the ordered 
specifications, therefore you usually do not need any cali-
bration.
For matching the signal to a receiving instrument or in case 
of regular calibration, adjust the output as explained in the 
following.

 

HOW TO CALIBRATE THE OUTPUT SIGNAL

Use a signal source and measuring instruments of sufficient 
accuracy level.  Turn the power supply on and warm up for 
more than 10 minutes.

1) ZERO:  Apply 0% input and adjust output to 0%.
2) SPAN:  Apply 100% input and adjust output to 100%.
3) Check ZERO adjustment again with 0% input.
4) When ZERO value is changed, repeat the above proce-

dure 1) – 3).

MAINTENANCE

Regular calibration procedure is explained below:

 

CALIBRATION

Warm up the unit for at least 10 minutes.  Apply 0%, 25%, 
50%, 75% and 100% input signal.  Check that the output 
signal for the respective input signal remains within accu-
racy described in the data sheet.  When the output is out of 
tolerance, recalibrate the unit according to the “ADJUST-
MENT PROCEDURE” explained earlier.

LIGHTNING SURGE PROTECTION

We offer a series of lightning surge protector for protec-
tion against induced lightning surges.  Please contact us to 
choose appropriate models.