Pag. 28/33
ISM0210 Instruction Manual of series SCE - Rev.03
APPENDIX A – Register of maintenance and periodic checks of the pump
It is provided a list of maintenances to be carried out and their respective ranges; you must register these
operations.
Commissioning date: ____________________
Main
maintenance operations to be performed by the second year of use onwards:
N.
Required check
Warnings and protective measures
be taken to perform maintenance
properly and safely
Range
2
Internal bearings
Check the condition of bushings, sleeve
bearings and thrust bearing if worn
replace them, reassemble using new
gaskets
After 2500 hours,
check any premature
wear, then every
5,000 hours or every
year.
3
Wear ring
Check the status of the wear ring, see the
table of tolerances
After 2500 hours,
check any premature
wear, then every
5,000 hours or every
year.
4
motor bearings
Unless other specifications, motor
bearings are greased for life, so there is
not a maintenance schedule, anyway it is
recommended to check the condition of
the bearings and replace them when worn
DATE
DESCRIPTION OF OPERATION
(report the numbers associated with intervention and any
operations carried out in addition)
OPERATOR
SIGNATURE