M Design VENUS DHT Instructions For Installation And Use Manual Download Page 9

9

INSTRUCTION FOR INSTALLATION AND USE VENUS HT - WOOD

MONTAGE- UND BEDIENUNGSANLEITUNG VENUS HT UND DHT - HOLZ

M-DESIGN 

2.5 AIR SUPPLY FOR COMBUSTION

Every form of combustion uses air. In the casae of a termally sea-

led room supplementary air supply is essential. One must at alle 

times avoid creating under-pressure in the room.

If a cooking hood appears to be absolutely essential in a adjoi-

ning room, sufficient air supply will have to be provided to avoid 

every form of under-pressure.

It is preferable to let the air supply come in from the stove or 

otherwise as near to it as possible.

The combustion is automatically kept under control by bimetals. 

This povides regular, consistant combustion.

Manual control is another possibility and, in is doing, the com-

bistan may be adjusted to possible increase ( position handle 

fig. 5a ) or decrease the intensity of the fire ( position handle fig. 

5b)

 

2.5 VERBRENNUNGSLUFTZUFUHR

Jede Verbrennung braucht Luft. Im Falle eines thermisch abgeschlossenen Zimmers, 

ist eine zusä�liche Luf�ufuhr notwendig. Auf jeden Fall sollte man vermeiden einen 

Unterdruck zu verursachen. Ein Unterdruck kann auch entstehen wenn eine Dunstab-

zugshaube in einem angrenzenden Zimmer installiert wurde. Um den Unterdruck zu 

vermeiden wird eine zusä�liche Luf�ufuhr empfohlen. (Fensterkippschalter)

Die Luft wird durch eine Öffnung unter dem Kamin angezogen. Sorgen Sie deswegen 

für genügend Frischluft, vorzugsweise nah am Kamin, um Durchzug zu vermeiden. 

Ideal wäre es wenn die Luft von unten, hinten oder der Seite des Kamins zugeführt 

wird. Die Luft sollte aus einem belüfteten Schacht, einem belüfteten Raum oder von 

draußen kommen.

•Die Verbrennung des VENUS HT/DHT wird automatisch durch Bimetalle gesteuert. 

Diese sorgen für eine regelmäßige und konstante Verbrennung.

•Eine andere Möglichkeit ist die manuelle Reglung. Hierdurch können Sie die Ver-

brennung regeln. Figur 5a = offen , Figur 5b = geschlossen )

 

FIG. 5a

FIG. 5b

Summary of Contents for VENUS DHT

Page 1: ...Passion for fire VENUS HT DHT INSTRUCTION FOR INSTALLATION AND USE MONTAGE UND BEDIENUNGSANLEITUNG...

Page 2: ...EINSCHR NKUNGEN 11 4 2 VORBEHALT 11 4 3 HAFTUNGSHINWEIS 11 MONAGE UND BEDIENUNGSANLEITUNG VENUS HT HOLZ M DESIGN 2 SUMMARY 1 GENERAL 3 1 1 TRANSPORT AND INSTALLATION 3 1 2 FUEL 3 1 2 1 Wood 1 2 2 Forb...

Page 3: ...UND MONTAGE VENUS HT DHT sollte stehend transportiert werden oder in Ausnahmef llen in einem Winkel von 45 Das nen und Schliessen der T re nen Sie die T re langsam wenn das Feuer brennt Das zu schnell...

Page 4: ...4 kg wood in the replace This is like two normal pieces of wood Be carefull not to use palletwood this gives an enormous heat for continuous heating This can lead to re hazard We are not responsible f...

Page 5: ...ith the perpendicular The existing obstacles in the vicinity of the opening into the ue must be taken into account Do not connect more than one stove to a chimney ue Choose the best one Seal the unuse...

Page 6: ...cm This is to garantee a convection stream 2 4 ANSCHLUSS Wir empfehlen Ihnen f r den Anschluss ein Edelstahl oder 2mm Stahl Rohr Dieses Rohr ist nicht im Lieferumfang des Ger tes enthalten 2 4 1 Deck...

Page 7: ...250 200 STANDARD 1600mm 360 1600 505 382 30 1570 X 2507 2757 Min 50 mm 185 540 360 185 626 130 130 130 VENUS 850HT STANDARD 1550mm 1550 555 30 1520 X 2507 2757 382 Min 50 mm 360 270 215 185 360 685 18...

Page 8: ...520 X 2512 2762 382 Min 50 mm 360 270 215 360 560 560 958 360 560 958 2 0 0 200 560 610 672 588 VENUS 1000HT STANDARD 1500mm 1500 505 382 30 1470 X 2507 2757 320 270 360 185 670 360 185 765 360 130 Mi...

Page 9: ...e re position handle g 5b 2 5 VERBRENNUNGSLUFTZUFUHR Jede Verbrennung braucht Luft Im Falle eines thermisch abgeschlossenen Zimmers ist eine zus liche Luf ufuhr notwendig Auf jeden Fall sollte man ver...

Page 10: ...use a re always burns be er with its own ashes Cleaning the window Open the window Fig 10 We advise you to use M design s Bio Clean to clean the window which is available from your supplier It is one...

Page 11: ...rature more than 12 kw Costs for packaging and transport All costs not pre arranged with M design Costs linked to the misuse and or abuse of the appliance 4 GARANTIE 4 1 DAUER UND EINSCHR NKUNGEN 7 Ja...

Reviews: