FIGURE 2
(7) Route the power cord through the cable gland
and pressure block. (FIGURE 3)
FIGURE 3
(8) Strip approx. 6-8mm insulating part of the
wires from the power cord.
(9) Connect the
BROWN
wire to the terminal block
“
L
“
mark (Live wire).
Connect the
BLUE
wire to the terminal
block
“
N
“
mark (Neutral wire)
Connect the
YELLOW/GREEN
wire to the
terminal block
“
“
mark (Ground
wire).(FIGURE 4)
FIGURE 4
(10) Use the pressure block and its two screws to
fix the power cord, then cover back the back
plate.
(11) Secure the Floodlight with its mounting
bracket using the screws provided.
Note: The Floodlight can be installed only
horizontally (see the FIGURE 5a), not
Vertically (see the FIGURE 5b).
2
HORIZONTAL VERTICAL
FIGURE 5a & 5b
BULB INSTALLATION
CAUTION
: Always handle quartz halogen bulbs with
a soft cloth. Do not touch the bulb with your bare hand
as it will shorten the life of the bulb.
(1) Do not touch the Floodlight while it is in use or still
hot. Allow it to cool (about 5 minutes) before
touching it.
(2) Do not use halogen bulb rated higher than 500 watts.
(3) Disconnect the power cord or wall switch and then
remove cover screw on the top of the unit to open.
(4) Remove the glass cover. The cover is mounted on
hinges and will swing open.
(5) Install bulb by inserting one end first and depressing
until enough clearance is gained to seat the other
end of the socket. Rotate halogen bulb to assure
proper seating.
(6) To change a new bulb, lift one end of the bulb to
remove. Install a new bulb with the same steps
above.
TROUBLESHOOTING
Lights do not light on at all.
l
Check power supply.
l
Make sure that the bulbs have not burned out.
l
Check all wiring and connections.
Others
l
The specification of protective shield shall
consult to local service agent.
SPECIFICATIONS
Power Requirement
AC 220 ~ 240V/ 50Hz
Lighting Load
Max. 500W Halogen
Bulb
Waterproof
IP44
Protection Class
Class I
Power Cord Requirement
H05RN-F, 3G, 1.0mm²
Swiveling Angle
Vertical 90°
3 INS122EVSPEB