SP28-SS
Rev. A2 092017
7
Luxier
Installation
1. Install hand shower connector and attach
PVC tubing to complete the connection.
1
2
3
4
5
2. Mark the positions of the 2 brackets on the
wall and prepare the tile wall for drilling. Use
a piece of painters tape or masking tape over
the drill area to prevent damages to the tiles.
(
NOTE:
The distance between the two brack-
ets should be 770 mm or 30.31”)
770mm
30.31”
3. Using a drill with a tile bit, drill the hole
slowly into the tile. Do not drill into any piping
or wiring in the wall. Insert the anchors into
the wall.
1”