background image

4

KTS22 Rev.1 07/2018

Luxier USA

Installation

A. Shut off water supply at the valves. 

Remove old faucet and clean the 

mounting surface for installation of new 

faucet.

B. Insert the hoses and shank through 

the hole. The faucet hole on the mount

-

ing surface should be 1 1/2” in diameter.

A

C. Slide the Mounting Base and 

the rubber washer onto the faucet 

underneath the counter top. 

 

Install the metal washer and secure the 

faucet with the Brass Nut. Make sure the 

faucet is properly mounted in place.

C

B

D1. Apply Teflon (TPFE) tape on the 

shut off valves. Thread the tape in 

counter-clockwise direction.

D2. Use an adjustable wrench to tighten 

the water supply hoses, please do not 

overtighten the connections.

E. Turn on water supply to check for 

leaks at all connection. Remove spray 

head from the pull out hose and let the 

water run for about 1 minute and check 

for leaks. Reattach the spray head.

D1

D2

E

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

28

01. Hex Wrench

02. Cap

03. Setscrew

04. Handle

05. Cap 

06. Bonnet

07. Cartridge

08. Body

09. Spring

10. Pull Down Hose

11. Plastic Clip

12. Sprayer Head

13. Flange

14. Washer

15. Mounting Base

16. Rubber Washer

17. Water Supply Hoses

18. Metal Washer

19. Brass Nut

20. Mounting Rod

Reviews: