072018 Rev. 2
Luxier
4
Installation - Site Preparation
Installation - Drain Assembly
• Provide sufficient floor support. Check the floor at the installation site and make repairs as
needed.
• Waterproof the floor is highly recommended. Finished floor must be level.
•
Provide adequate clearance on all sides of the bathtub.
• Minimum of 2 inch waste drain pipe is required.
NOTICE: It is recommended to dry fit the parts before installation.
1.
Place a large drop cloth on the floor to protect the bathtub.
2. With help, lift the bathtub and place it on its side. Secure the bathtub to prevent it from moving.
3.
Assemble the elbow connector as shown in figure 1. Wrap PTFE tape to the thread on the drain
body and thread on the elbow connector (#07)
4.
Upright the bathtub and carefully move it to the final installation position. (
NOTICE:
Do not drag
the bathtub on the floor as it will damage the bathtub.)
5.
Connect the flexible drain pipe (#08) to the elbow connector and connect the other end to the
waste pipe.
Drain Body (01)
Flange Gasket (02)
Overflow (05)
Overflow Channel (06)
Flexible Drain Pipe (08)
Elbow Connector (07)
Drain Gasket (03)
Locking Nut (04)
Fig. 1