Luxair LA-1200-Jet Installation Manual Download Page 3

Thank Your For Your Purchase Of The New Jet Ceiling Cooker Hood

Make all the necessary height 

adjustments to your required 

specifications. 

Ensure you make good all fixings 

on the upright legs using nuts and 

bolts (not supplied) as required.

A minimum of 4 x each leg.  

As with the above instructions 

please now secure the main frame 

to your joists using minimum of 6 x 

coach bolts or coach screws.

It is not necessary to use this frame 

part if your leg fixings are adequate 

and secure however always try to 

use this if possible.

Ensure that your ceiling cut out 

dimensions or lowered box section is 

correct and that you dry fit the hood 

prior to full installation takes place.

Make adjustments where necessary 

Reviews: