Installation
Completing the installation
15
© Lutz-Jesco GmbH 2016
Subject to technical changes.
160426
Vacuum Regulator for Chlorine Gas
C 2700-V
Operating Instructions
BA-21210-02-V05
6.3.3 Safety valve
The blow-off line is a tube whose open end should be located in the
vicinity of the gas sensor. The installation of an activated carbon
cartridge is recommended at the open end of the tube which prevents
an alarm being issued in the event of system-related short shock pres-
sures.
Fig. 6-6: Blow-off line
Installing the blow-off line
Precondition for action:
The chlorine input of the vacuum regulator is installed.
The chlorine output of the vacuum regulator is installed.
The transport protection on the safety valve has been removed.
Fig. 6-7: Installing the tube connection
Perform the following working steps:
1.
Cut the tube (
) at a right angle.
2.
Push the union nut (
3.
Push the end of the tube onto the cone of the tube connection (
4.
Tighten the union nut by hand.
5.
Secure the tube onto the wall.
6.
If relevant, install the activated carbon cartridge at the open end of
the tube.
Installed blow-off line.
6.4 Completing the installation
After completing installation, you must check that all the connections
are leak-proof (see "Inspecting the pressure system" on page 18 and
"Inspecting the vacuum system" on page 19).
Item
Description
1
Vacuum regulator
2
Blow-off line
3
Activated carbon cartridge
4
Gas sensor
A transparent PVC tube is ideal as a blow-off line. It becomes
milky in appearance when it comes into contact with chlorine
for the first time and thus allows faults to be detected early
on.
4
3
2
1
i
3
1
2
All the exposed bare metal surfaces must be painted as the
atmosphere in chlorine gas rooms is highly corrosive. A two-
part epoxy resin varnish yellow RAL1003 is suitable for
example. The surfaces must not be painted until after
successful completion of the leak test.
i