8 Control
8.1 Controls
Fig. 15: Controls
No.
Description
1
Hand activation on the electrical regulation valve (optional)
2
Manual dosing valve
3
Flow indication
4
Vacuum indication
5
Signal converter (optional)
Table 16: Elements in the device
8.2 Manual operation
The electrical regulation valve must be completely opened for manual
operation. To this end, the valve spindle is locked in the upper position.
Perform the following working steps:
1.
Remove the upper protective cover (1) on the electrical control valve.
2.
Grasp the ball knob (2) and pull the valve spindle upwards against the
spring force.
3.
Swing the locking washer (3) into the groove.
4.
Release the ball knob.
5.
Set the dosing quantity on the manual dosing valve.
ü
The electrical valve is locked in the OPEN position.
#
Fig. 16: Switching the control valve
8.3 Automatic operation
The manual dosing valve must be completely opened for automatic
operation. To do so, the manual dosing valve is opened c. 10 revolutions.
The electrical control valve must be completely opened for automatic
operation.
Perform the following working steps:
1.
Remove the upper protective cover (1) on the electrical control valve.
2.
Grasp the ball knob (2) and pull the valve spindle upwards against the
spring force.
3.
Swing the locking washer (3) out of the groove into the central
position.
4.
Let the valve spindle be pulled downwards by the spring force and
release the ball knob.
4
The dosing quantity follows the electrical control signal automatical-
ly.
ü
Device switched to automatic operation.
1
1
2
2
3
3
4
4
5
5
3
2
1
Summary of Contents for C 2526
Page 2: ......
Page 46: ...Index 46 Lutz Jesco GmbH 2016 BA 20901 02 V01 Chlorinator C 2526 Operating instructions...
Page 48: ......