![Lutron Electronics DW-6195 Operation Manual Download Page 52](http://html1.mh-extra.com/html/lutron-electronics/dw-6195/dw-6195_operation-manual_1950895052.webp)
B : Operation Instructions:
B-1 : Power on the instrument by pressing POWER KEY,
and then press 1Φ3Φ KEY to select the 1Φ3W system,At the
time, display will show 1Φ3W connect diagram approx 4 sec.,
and the selected name of system will be appeared on bottom
left display of screen 2.
B-2 : Connect the line voltage L1, L2 and Vn (Neutral) to
V1, V2 and N terminals of the instrument.
B-3 : Place the conductor of CP-1201(A1), CP-1201(A2)
hook to A1 and A2 as screen 1.
B-4 : Connect the outputs of clamp meter
CP-1201(A1)
、
CP-1201(A2) to A1 and A2 terminals of
the instrument.
B-5 : The related measuring factors will be appeared on
display, about the instruction of factor please refer
appendix 1 ( 5-16, page 68 ).
Remark:
During connection ,If want to check connect Correct or not,
please press and hold the "
▼
" key, display will show 1Φ3W
connect diagram,when release the "
▼
" key , will back to
measurement.
screen 2 ( 5-2 )
V1 :
0.0
V
P 1 : -
0.000KW
V2 :
0.0
V
P 2 : -
0.000KW
A1 :
0.00
A
S 1 :
0.000KVA
A2 :
0.00
A
S 2 :
0.000KVA
Q1 :
-
0.000KVAR
Q2 :
-
0.000KVAR
PΣ:
0.000 KW
SΣ:
0.000 KVA
QΣ:
0.000 KVAR
PF1:
-
0.00
PF2:
-
0.00
PFΣ:
0.00
PFH:
0.00
Φ1:
-
0.0°
Φ2:
-
0.0°
WH:
0.000 KWH
SH:
0.000 KVAH
QH:
0.000 KVARH
FREQ:
50.0 Hz
CP1201
20A
1Φ3W
SEC: 2
CT: 1
PT: 1
48
Summary of Contents for DW-6195
Page 59: ...55...
Page 63: ...Screen 1 5 9 Screen 2 5 9 59...
Page 66: ...Screen 2 5 10 Screen 3 5 10 62...
Page 79: ...EXCEL graphic screen 2 for example EXCEL graphic screen 3 for example 75...