Lupo SUPERPANEL 30 User Manual Download Page 4

Dayled 650 / 1000 Instructions

Install the softbox on the Dayled 650 PRO and Dayled 1000 PRO (fig.1)

Tighten the elastic to close the gap between the softbox 

and the Dayled PRO until it’s fixed (fig. 2).

To tighten the string pull it through the hole and hold it.

(fig. 3)

fig. 2

fig. 3

fig. 1

Reviews: