background image

Foundations

1.

The key to stability, functionality and endurance is a good foundation for your summer house. Only

ensure a perfect fit for the timbers, the door and the window while

guaranteeing stability.

In the general drawing you will find the dimensions of your cabin to allow you to

prepare your footings - the 8+8 pedestal beams are laid crosswise; the 11 T1s, 1.50 m in length, are laid for the
veranda, the 2 T2s, 0.50 m in length, support the corner posts of the veranda's balustrade and the first
floorboard at the entrance. See

showing how to place the foundation beams

for the cabin and the terrace.

absolutely level, strong footings

Flagstones or paving bricks on top of a (frost-free) bed of gravel are suitable, but frost-resisting
concrete (either over the whole area or in the form of piers) is also ideal as a base for the floor-joists (and
is also good for ventilation).

diagram 2 and detail drawing

Please read chapter 7 "Protection against gales" before preparing the

foundations.

Pre-sorting

2.

Pre-sorting - you don't need to worry about the number of parts when you open the package -

Please refer to

for assistance. This shows all the parts belonging to the 4 walls and

gives you a guide to assembling the entire structure. The references on the drawing allow you to

according to their dimensions - all the parts are listed here

once more, together with their approximate measurements.

everything

becomes much easier once you have sorted the pieces into their appropriate categories!

diagram 1 and the part list

compare

them with the list of parts and allocate the parts

Important!

Please check the content of the

packages with the part list and contact your dealer if something is missing or can not be used for the purpose.

5

2.

Nail the jointing boards J1
as shown in diagram

J1

J1

48x98

Lillevilla 80

300109

Summary of Contents for Lillevilla 80

Page 1: ...900 mm x 5650 mm 28 7 m 3130 mm 1690 x 1820 mm 1190 x 870 mm 2100 mm Lillevilla 80 300109 Wall boards Dimensions of pedestal Area of roof Height of ridge 1 glazed double door width x height 3 glazed windows width x height Height of walls Guarantee number Important Keep this Controlled by ...

Page 2: ...arnish or paint manufacturer It is not advisable to paint the wall timbers before assembling them this is best done when the cabin has been erected and the weather is fine However if you wish to paint odd parts in different colours this should be done before the cabin is assembled Please check the content of the package before you start building your cabin and contact your dealer if something is m...

Page 3: ...3 1 Front wall 15 log layers 15 log layers Back wall cut out 35 mm cut out 75 mm Lillevilla 80 300109 ...

Page 4: ...1 4 16 log layers 16 log layers Side walls Lillevilla 80 300109 ...

Page 5: ...rs is also ideal as a base forthe floor joists and is also good forventilation diagram 2 and detail drawing Please read chapter 7 Protection against gales before preparing the foundations Pre sorting 2 Pre sorting you don t need to worry about the number of parts when you open the package Please refer to for assistance This shows all the parts belonging to the 4 walls and gives you a guide to asse...

Page 6: ...purposes the ends of the timbers protruding at the corners require particular care to prevent the wood from splitting However if they happen to split or crack it has no negative constructional effectsandcrackscanbegluedlater Clean the possible burrs caused by the drilling of the planks of the front and rear wall That way the planks of thewallswillfitbetterinthegrooves This frame shows the size of ...

Page 7: ...he roof overhang is supported by the planks C4 C6 C7 D4 D6 D7 which get progressivelylonger so payspecialattentiontothediagram1 fortheconstructionofthesidewalls Thefrontwallis completedby using thepredrilledplankA5 whichhas acutoutforthedoubledoor Now it is time to assemble the gable triangles and the purlins First lift the gable parts A6 B2 on their places and then lift two of the purlins L1 on p...

Page 8: ...of the solid wood door be avoided altogether in viewofthe seasons loosely 8 Lillevilla 80 300109 Thethreaded rods cornerbolts Notice chapter7 Protectionagainst gales diagram7 Moreover the walls tend to lean outwards towards the top when being erected this is to be expected allowance above these fittings Fix to the top of a threaded rod a washer and a nut Pass the rods of the front and rear walls t...

Page 9: ...tongues and grooves of the last 5 10 boards to allow the wood to swell in damp weather without the risk of the floor arching upwards as might happen if theboards wereatightfit Ifthiscausesaproblem you willneedtocutthelastfloorboard Once the surface has been covered evenly the floorboards are nailed securely to the floor joists and the skirting boards fixed all the way round the underside is recogn...

Page 10: ...embled the rounded side downwards and the side with the chamfers and the groove upwards Here again any unevenness caused by the planer rough edges etc even in the grooves and tongues are due to well tried production techniques and quite normal and not a reason forreclamation Begin with the 2 profiled boards with the groove pointing outwards on the outeredge of the purlins the top edge of the roof ...

Page 11: ... Protection against gales 7 Your 45 mm log cabin is extremely solid and stable there is no doubt about that but the burden on any house causedby theforceofgalesmustbeconsidered For this reason a stable firm foundation house roof connection is all important To enhance the gale recistance of your summer house the Lillevilla 80 is equipped with a tension rod system This is probably the bestandmoststa...

Page 12: ... rear walls They are ment to give extra support for the long walls of the cabin There are three slits and one pre drilled hole in each wall support Screw the metal plates can be found from the accessories bag see on the slits 2 screws plate and 3 plates support Fit the supports to the front and rear walls as shown in diagram The lower end of the support may reach the floor inside the cabin Drill 1...

Page 13: ...nd arrange them prior to nailing them so that they are evenly spaced The final floorboard T17 protrudes slightly at the front between thecornerposts pleasemakesurethatthisboardis wellandfirmlysupportedby thefoundationbeams The floorboard next to the house shall be screwed in place to be removed when checking the tension rod systemofthehouse The corner posts are screwed to the footings using metal ...

Page 14: ... T6 Wall timber half width 45 x 65 x 375 2 T7 Wall timber half width 45 x 65 x 250 2 T8 Balustrade 34 x 145 x 970 2 T9 Balustrade 34 x 145 x 1500 2 T10 U profile 34 x 65 x 640 2 T11 Connecting plank 16 x 145 x 650 4 T12 Metal brackets 2 T13 Foundation beams 48 x 98 x 1500 11 T14 Foundation beams 48 x 98 x 500 2 T15 Floorboards 21 x 95 x 3778 14 T16 1 Floorboards 21 x 95 x 1780 14 T16 2 Floorboard ...

Page 15: ...The best result will be achieved in dry circumstances when the temperature is over 5 ºC Doors and windows must be treated from both sides The building needs to be treated also with protection against blue stain and moulding specially the corners Treatments both in and outside must be renewed regularly following the instructions of the producer of the protective liquid Follow carefully the conditio...

Page 16: ...135 x 3527 6 A3 Wall timber 45 x 135 x 1709 7 A4 Wall timber cut out for door above 35 mm predrilled 45 x 135 x 5850 1 A5 Gable triangle predrilled 45 x 314 x 5560 1 A6 Gable triangle predrilled 45 x 449 x 3928 1 A7 Gable triangle predrilled 45 x 555 x 2272 1 A8 Wind shield 16 x 145 x 3170 2 A9 Strips for roof felt 16 x 95 x 3170 2 A10 Rear wall B Wall timber predrilled 45 x 135 x 5850 15 B1 Gable...

Reviews: