lumz LUCCI BL-16A-J-W9-30 Series Installation Manual Download Page 2

ANCHOR

BOLT

BASE

PLATE

NUT

WASHER

SCREW

POLE

BASE PLATE

POLE

LUMINAIRE

SCREW

POLE

BASE PLATE

CONNECTOR

5

!

POLE

LUMINAIRE

2

3

4

1

we brighten up your life

 

 

LUMZ PTE LTD

INSTALLATION MANUAL

LUCCI BOLLARD

Factory:

No.14, Jalan Anggerik Mokara 31/44, Kota Kemuning Seksyen 31,

40460 Shah Alam, Selangor, Malaysia. 

Tel: (00603) 5121 1887

Fax: (00603) 5121 5187

Email: [email protected]

INSTALLATION

Singapore Office (HQ Sales & Marketing):

1 Coleman Street #10-06, The Adelphi, 

179803, Singapore.

Tel: (0065) 9758 2771

[email protected] 

www.lumzlighting.com 

LUCCI BOLLARD/INSTALLATION MANUAL/REV.0

2/2

Fix luminaire back 

to pole by rotate it.

Make sure it is fix 

tightly.

# Recommended Anchor Bolts:

NOT  ≥ Ø8mm

Remove all three 

screws from pole 

to separate base 

plate for 

installation.

# Make sure power is disconnected before installation

Connect wires with connector.

Remove luminaire 

by rotate to 

separate pole for 

wiring installation.

Fix pole back to 

base plate with 

screws provided.

Make sure all 

screws fix tightly.

Reviews: