32
10.3
Testing Panel Integration
Test the integration of the panel into the monitor to ensure successful panel integration.
To test the panel integration:
1.
Position the integrated monitor
horizontally.
2.
Connect the integrated monitor to a PC
with the USB cable.
3.
Run Crystal Touch Manager.
4.
Navigate to: Login>Enter Administrator password (from Lumio)>Administrator>Scope.
The
Scope
window opens, displaying only the signal received by the top left sensor.
Note:
The top left sensor button is selected
On
in the
Sensors
pane of the
Scope
window.
Figure 30 Scope Window
5.
Apply vertical pressure on
TP1
(the first virtual test point situated on the monitor’s bezel), as displayed in
Figure 31 Test Points on the Monitor's Bezel