INSTALLATION GUIDE FOR
ARV13/YRV13 LED with SHCAB
RETAIN THESE INSTRUCTION FOR FUTURE USE
One Lithonia Way, Conyers GA 30012 | 1.800.705.SERV (7378) |
| © 2020 Acuity Brands Lighting, Inc. All rights reserved.
Page
3
of
4
INSTALLATION PROCEDURE
1. Remove Luminaire from carton and check for damage
2. Unscrew outer ring/eyelid by turning counter-clockwise.
3. Set aside lens and ring/eyelid for later use.
4. Dis-connect Driver wires to LED Board Assembly. Set wire nuts aside for later use.
5. Remove LED Board Assembly by loosening (2) 8-32 hex nuts located closest to the center
of reflector. Set aside for later use.
6. Remove ¼”–20 screws (4) that attached the Base Plate to the SHCAB.
7. Apply gasket to back plate.
8. Mount SHCAB to surface using (4) ¼ bolts (not included). While the fixture may be
mounted directly to junction box using keyhole slots provided, we recommend using the
¼” bolts for maximum vandal resistance. Recommended mounting hole locations can be
located on the back surface of the SHCAB – see Figure on page 3. (For wall mounting, the
SHCAB should be mounted with the arrow pointing upward – see step 11.)
9. Connect all supply wires in accordance with national and local electrical codes.
10. Wires should be pushed through center hole in SHCAB and should be contained in
recessed junction box.
11. Locate set screw. The fixture must be mounted so this screw is aligned with the three
o’clock position.
Ring / Eyelid
Set Screw
Lock
Unlock
Set Screw
Ring/ Eyelid
Set Screw
Ring / Eyelid
Unlock
Lock
WARNING
- The main (white LED) circuit and the auxiliary circuit (Nightlight) are to be wired to
separate circuits that can’t be powered on simultaneously.