Lumi WEDDING CAKE II Installation Download Page 1

fi g . 3 

S t ep  3 

THE WEDDING  C AKE II   

Installation

fi g . 2 

Éta p e  2 

fi g . 5 

S t ep  5 

fi g . 4 

S t ep  4 

B r a c e 

(sho r t ) 

R am p 

Sup p o r t tu b e 

(long) 

Rev.  2007-11-20

H elpful hi n t :    t o ease the install a tion of  r ails and  b olt s ,  use a sc r e w d r i v er  t o line up hole s . 

M a t e r ial included: 

16x 

P lastic  c ap (4 ) 

R am p 

B r a c e 

Sup p o r t tu b e s 

#1 

#2 

Sup p o r t tu b e 

-  A u t om a tic sc r e w d r i v e r 

-  P air of g r i p 

R equi r ed  t o ols : 

N ot included : 

4“ fl a t head  b olt   

F inished  w ashe r 

N u t 

L o c k nu t 

¾“ sc r e w 

½ ”  fl a t head  b olt   

1½ ”  sc r e w 

3“  b ol t 

9x  9x  4x  4x  7x  5x 

2x 

#3 

W ashe r 

4x 

S t ep  2 

-  C iso r 

4-               P la c e the sho r t er sup p o r t tu b e 
in the o p ening  a t the  t op of the s t e p .     
Line up the holes and fix the sup p o r t   
tu b e with the 3 ”   b olts (2) ,   w ashers (4) ,   
and l o c k nuts (2) included using the   
o p ening in the back .    S lide the b r a c e    
on the up p er sup p o r t tu b e (fi g .  4) . 

1-             Install 2 protective foam pads
under each reinforcement parts. Fill the 3 
reinforcement parts of pea gravel*, 
following quantities as shown on (fig.1). 
Install the plastic caps.

5-              Inse r t the  r amp on  b ot h 
sup p o r t  tu b e s .    F ix the  r amp  t o the   
sup p o r t  tu b es with ¾ ”  sc r e w s (4) .   
(fi g .5) . 

2-             Lay the step and fix the 
reinforcement 1 and 2 at the appropriate 
places with the 1 ½ flat head bolts (6), 
washers (6), finished washers (6) and 
nuts (6). Fix the reinforcement #3 with  
4”  flat head bolt(2), 1 ½ flat head bolt (1),  
washers (2), finished washers (3), and  
nuts (3). 

  

  

S t ep  6 

fi g . 6 

B allas t 

6- 

Cut and dispose the nylon 

strap placed to retain the ballast unit  
with pea gravel*, seal with the plastic 
cap. (fig. 6). 

fi g . 1 

R ein f o rc eme n t  2 

R ein f o rc eme n t  1 

R ein f o rc eme n t  3 

M ax .  q t y . 

S t ep  1 

F ill  c omple t el y 

F oam pad (6 ) 

- Pea gravel 
Note : You will need approximately 
150 lbs of pea gravel. 
- Shim 

 

3-              L a y the s t ep on the fl a t side   
and inse r t the longer sup p o r t tu b e in   
the o p ening  a t the  b ot t om of the s t ep   
and fix it with the 3 ”   b olts (2) ,   w ashers (4)   
and l o c k nuts (2) included and  r aise up   
the s t ep (fi g .3) . 

p.1 

Read carefully the cautions and every steps before assembly and using your step.

Caution : File off all stripped or sharp edges before assembly to avoid injuries and pool damage.

Reviews: