
21
en
ND30-09C 13 User's manual
Fig. 12a. Programming matrix
Voltage
transformer
secondary
00100.0
Parameters
Settings
Logical
conditions
C1
C1 v C2 v C3
C1
C2
C3
(C1
C2
) v
C3
(C1 v
C2)
C3
Relay state
if alarm on
off
on
Alarms
Alarm 1
Alarm 2
Current
Transformer
primary
Holdback
Alarm off
off
on
Demand
integ. time
AVG
synchronization
Pt100 reist
on inp 1
Pt100 reist
on inp 2
PT100 [
]
Delete energy
counters
Delete
demand
values
No
Yes
Connection
wire
Current
input range
1 A
5 A
Voltage input
range
3x57.7/100 V
3x230/400 V
3 phase-4 wire
3 phase-3 wire.
1 phase-2 wire
00005
15 min
30 min
60 min
lack
with RTC
PT100
[
]0000.00
0000.00
No
active
reactive
apparent
all
Condition C1
Condition C2
Condition C3
Value
U1
I1
P1
Q1
:
gg:mm
Condition
type
n_on
noFF
on
oFF
H_on
:
3_oF
Delay to
condition off
[s]
0000
Low limit
condition
[%]
+0099.0
Display alarm
event
off
on
High limit
condition
[%]
+0101.0
Delay to
condition on
[s]
0000
Holdback
condition
off->on
[s]
0000
Display
condition
event
off
on
Analog
output
Value
Output
range
0...20mA
4...20mA
Low limit
input.[%]
+000.0
High limit
input [%]
+100.0
Low limit
output
[mA]
0.00
High limit
output
[mA]
20.00
Out mode
normal
low limit
output
high limit
output
U1
I1
P1
Q1
:
gg:mm
or
3x110/190 V
3x400/690 V
Set
parameters
default
No
Yes
No
Yes
Set default
No
Yes
Set defaults
Voltage
Transformer
primary
0000100
Current
transformer
secondary
00005
Voltage
connector 2
U1
U2
U3
Voltage
connector 5
U1
U2
U3
Voltage
connector 8
U1
U2
U3
Current
connector 1-3
I1
-I1
I2
-I2
I3
-I3
Current
connector 4-6
I1
-I1
I2
-I2
I3
-I3
Current
connector 7-9
I1
-I1
I2
-I2
I3
-I3
Fig.11a. ND30
PNET
and ND30
BAC
programming matrix
To enter the parameters menu press the button for approx. 3
seconds.
Buttons
allow to select the appropriate mode, to accept
press the button
To return to a measurement mode use the button
Summary of Contents for ND30BAC
Page 35: ...35...