LUCKY DOG Easy Ship CL 61598 Manual Download Page 4

STEP #6

Now you are ready to install the bottom two side 
rails (Part G) into the bottom receiver tubes of the 
corner stands just installed and tighten set screws. 
At this point, carefully stand the entire gate side of 
kennel upright and install the top two side rails into 
the top receiver tubes and tighten set screws.

STEP #7

If you have purchased a 5' long kennel, you will 
now install the remaining two corner stands 
(Part C) and remaining two upper and lower end 
rails (Part F). If you have purchased a 10' or 15' 
long kennel, you must continue to install the side 
rails using the center stands (Part F) until you have 
completed the full length of your kennel. Now 
install your remaining two corner stands and two 
remaining upper and lower end rails as first outlined 
in this section.

Hint!

There is one side section on a 5' long kennel, 

two side sections on a 10' long kennels and three 
side sections on a 15' long kennel.

STEP #8

GALVANIZED CHAINLINK 

MESH INSTALLATION

For ease of shipping the 
compact roll of 
chainlink mesh is 
folded versus rolled. 
The recommended 
handling of this mesh 
is to unfold it onto a 
flat surface checking 
along the top and bottom for pickets that may have 
come unhooked from each other or that need to 
be twisted back into place. After checking, roll the 
chainlink back up in the manor you would roll up 
a carpet. This will insure ease of handling when 
proceeding with the final installation steps.

Stand roll of chainlink next to the corner stand with 
rod clips (Part E) and insert a round tension rod 
(Part H) into end of mesh and hook the rod into the 
rod clips as shown in Figure 2.

Hint!

Attach chainlink mesh to upper side rail 

using a steel tie wire (Part J) to insure the mesh stays 
at proper height.

STEP #9

Unroll chainlink mesh around the outside of the 
kennel frame. Pulling mesh tight at each center 
and/or corner stand, use a steel wire tie (Part I) to 

secure the top and bottom of the mesh to the top 
and bottom rail so the mesh will not slide back and 
become loose.

STEP #10

Once you have completely unrolled the chainlink 
mesh around the entire kennel frame, you will install 
the final round tension rod into the rod clips on the 
hinge side of the gate.

Hint! 

The chainlink mesh is pre-cut to easily fit 

the kennel size however the exact mesh length is not 
always possible. Therefore, one or more chainlink 
pickets may need to be removed to insure proper 
tension on the mesh. 
If pickets need to be 
removed, straighten out as 
many pickets as necessary 
at top and bottom and 
twist out the picket until 
proper length is achieved 
(Figure 3).

STEP #11

Install the lockable fork latch (Part B) on the 
latch side of the gate. Tighten bolts until latch is 
firmly attached to gate frame. Pull the gate frame 
toward the corner stand until the proper distance 
between corner stand and gate frame is achieved 
(approximately 2" gap). Make sure latch opens and 
closes easily. Tighten the final set of screws on the 
gate stand (Part A).

STEP #12

Using the remaining 
steel tie wires (Part I), 
begin tying the mesh 
securely to all top and 
bottom rails (Figure 4). 
Make sure the tail end 
of the tie wire is always 
pointing outside the frame 
to insure your pet does 
not come in contact with it. The bottom tie wires 
should be approximately 12" apart and top rail 
ties approximately 18" apart. If any additional tie 
wires are left, you can use them at the corner and/or 
center stands.

STEP #13

If you have purchased the Yard Guard or Hi-Rise 
Kennels or a Weatherguard

 Kennel Cover, please 

skip Step 13 and begin assembly of you kennel cover.

Insert stand caps (Part J) into top opening of corner, 
center stands and gate frame. 

Fig. 2

Fig. 3

Fig. 3

Fig. 4

Fig. 4

Reviews: