DLP-513
234-151-077AC
3
of
1
Page
1999
June
7,
Issue
Phases
Diagnostic
(SCC)
Controller
Circuit
Service
Demand
Note:
this
of
end
the
at
A,
Table
in
provided
are
phases
diagnostic
SCC
of
list
A
procedure.
enter:
terminal,
(MTC)
Maintenance
1B
the
At
1.
DGN:SCS
a,CONTR b
1-16!
:PH
where
a
(0-7)
number
Member
=
b
1)
or
(0
number
Controller
=
run?
diagnostics
Did
2.
If NO
3.
Step
to
continue
,
If YES
4.
Step
to
go
,
data.
corrected
the
using
1
Step
to
return
and
message
output
the
Analyze
3.
(ATP)?
Passed
Tests
All
indicate
message
output
the
Does
4.
If NO
5.
Step
to
continue
,
If YES
9.
Step
to
go
,
1?
Step
in
entered
message
the
by
generated
(TLP)
Procedure
Trouble-Locating
a
Was
5.
If NO
6.
Step
to
continue
,
If YES
7.
Step
to
go
,
entering:
by
TLP
a
generate
terminal,
(MTC)
Maintenance
1B
the
At
6.
DGN:SCS
a,CONTR b
1-16,TLP!
:PH
where
a
(0-7)
number
Member
=
b
1)
or
(0
number
Controller
=
list
equipment
suspected
TLP
on
packs
circuit
replacing
by
failure
diagnostic
the
Clear
7.
(TAP-106).
Proprietary
—
Technologies
Lucent
instructions
Company
to
pursuant
Use
Summary of Contents for 4ESS SCS
Page 8: ......
Page 16: ......
Page 18: ......
Page 44: ......
Page 52: ......
Page 66: ......
Page 76: ......
Page 104: ......
Page 116: ......
Page 120: ......
Page 124: ......
Page 136: ......
Page 148: ......
Page 164: ......
Page 166: ......
Page 172: ......
Page 186: ......
Page 194: ......
Page 220: ......
Page 236: ......
Page 242: ......
Page 256: ......
Page 282: ......
Page 288: ......
Page 290: ......
Page 298: ......
Page 306: ......
Page 320: ......
Page 324: ......
Page 336: ......
Page 344: ......
Page 348: ......
Page 362: ......
Page 366: ......
Page 378: ......
Page 386: ......
Page 394: ......
Page 402: ......
Page 416: ......
Page 420: ......
Page 424: ......
Page 432: ......
Page 442: ......
Page 458: ......
Page 464: ......
Page 470: ......
Page 474: ......
Page 476: ......
Page 478: ......
Page 490: ......
Page 496: ......
Page 510: ......
Page 520: ......