Amtsgericht Duesseldorf HRB 76903 Steuernummer
:
DE316746274 Bankverbindung: Deutsche Bank IBAN
:
DE77 3007 0010 0058 6958 00 BIC/Swift: DEUTDEDDXXX
Lubmann GmbH
Automatic Lubrication Systems
System Design/Cautions in Installation/Debugging
Cautions in Installation
4. The mainline and distribution line should be short as much as possible in order to avoid more bends (when they are
bended, the minimum bending radius of Φ10×1.5 and Φ4×
0.75 nylon tubing is R90 and R40). Less bends can decrease
the loss of the pressure and ensure free discharge.
5. The distribution line must be full of grease before installation. The Mainline also must be full of grease in installation
below centigrade 5℃
.
6. Tubes must keep clean and have not contaminator.
7. Flexible tubes should be 1% longer than straight length when they are installed on in-line installation.
8. The installation of mainlines and distribution lines should avoid engine, warm air blower and the bends of and steel
spring plates.
9. If the mainline and distribution line use nylon tubing, they should be enclosed by corrugated tubes.
10. Some tubes, which are removable or across holes in the beam, must be protected by tube shroud.
Debugging
When
the system are being debugged, terminals of mainlines must keep open (i.e. don’t screw on choke plug and
pressure sensor). Pressing the C key in the remote control will make the pump module work 20 seconds, and then do it
again after the pause for 20 seconds. The discontinuous running can exhaust air from mainlines. Afterwards the
terminals that are bleeding should be blocked by choke plug or connected the pressure sensor.
Press C key in the remote control makes the pump module work. Then press it again after the pump stops for 120
seconds. Repeat it several times until every friction pairs is overflowing.
If some lube points are not overflowing, a manual operated reservoir-fill gun must be full of grease that is also used in
the system to clear the blockage. And then see if the working condition is in accord with requirements.
[Note]:
Opening and shutting methods of the reservoir housing
1.
Opening method:
Pressing the semicircular bulges on both sides of the reservoir cap with both thumbs, and then
propping the earlike parts on both sides of the housing with your bent index finger. Squeezing and then pulling
upward the parts sharply can remove the housing easily. Single-hand operation is also available at your inconvenience.
2.
Shutting method:
Taking the housing, and making its ear-holes on the both side level at the semicircular bulges on
both sides of the reservoir cap. Then pressing the top of the housing can make the housing and the reservoir cap
locked.