
5
Grea
se
Re
fill
ing
Grease Refilling
ALP01 Pump
1. Take off the magnet cap (
Dia. 5.1-1
).
2. Connect the manual/electrical grease gun with
the greasing nipple under the magnet cap (
Dia.
5.1-2
).
3. Inject the grease into the reservoir smoothly till
the “MAX. Grease Level”* (
Dia. 5.1-2
).
4. Disconnect the grease gun and greasing nipple
and clean the greasing nipple, put the magnet
cap back into the position (
Dia. 5.1-3
).
* Attention: please slow down the grease injection speed
specially when the grease level in the reservoir almost
reaches “MAX” to avoid over-refilling (the grease level can
not be higher than the ventilation).
Important Tipps by the first time grease filling
During the first time grease filling, the air bubble
might be built in the reservoir*. To get rid of the air
bubble, the level of the grease needs to be around 1-
2 mm higher than the ventilation hole to drain the air
bubble out of the reservoir (
Dia. 5.2
).
Start a test greasing cycle to check the lubricant
comes out from the lubricator outlet. Make sure there
is no air bubble mixed in the lubricant. Otherwise
continue the test greasing cycles.
* Too much air bubble might damage the friction pairs.
Please make sure the grease level NOT higher than
“MAX. Grease Level” during a regular refilling
process.
Important Tipps by outdoor or Food Grade
Application
For the high-level environment standard, a grease
film is strongly recommended.
1. Get the air rid of the reservoir.
2. Clean the surface around the ventilation.
3. Put the grease film on the ventilation.
Produc
t Manual
-ALP
01 S
ingle
Point
Lubric
ator
1
3
2
1-2 mm
Dia. 5.1
Grease Refilling
Dia. 5.2
Ventilation of Reservoir