P A D - C L I M A T E - S Y S T E M
Assembly instruction and operators manual
Assembly
11
3.7.1. Bracket for Watergutter
The Brackets for the Watergutter are beginning fastened from the Supply Unit.
Measure off the two Brackets for the Supply Unit and those or the last Bracket. Then
mark with a chalk line the horizontal connection.
The Supply Unit is already pre-assembled. The Brackets of the Supply Unit must also
been fasted in desired position.
The uniform load of the ready for use system is 75 kg/m (165
lb/m)!
Fasten the Brackets in
constant
distances
from
max 75 cm (30
in)
Fasten each Brack-
et with 3 fasteners
and washers.