
Troubleshooting
5
5.2.5.ELECTRONICS
The system electronics consists of the timing system, controllers for
primary subsystems, and power supplies for most components in the FG5. Some
of the electronic subsystems are manufactured by Micro-g Solutions, while
others are “off-the-shelf” components from other commercial vendors.
Electronics problems can range from catastrophic system failures to subtle,
intermittent problems which are extremely difficult to detect and diagnose.
Table 5-5 gives a list of possible electronic problems and solutions. As with the
system controller, the majority of problems encountered with this system have
been poor or missing connections during setup.
Table 5-5
Electronics Problems and Solutions
Problem
Solution
A systematic gravity shift is observed
The rubidium clock has lost its
calibration. Check its frequency
against a standard Cesium
reference.
Beam verticality is off
Beam is not collimated
High rotation/translation of test
mass
Wrong laser lock or the laser
hopped a peak.
Sinusoidally varying gravity value
Rubidium standard is warming up
or will not lock. VCXO trim may
need adjustment.
Large noise (often looks like a
Superspring problem)
Poor system grounding.
Sometimes it is necessary to
ground the system electronics rack
to an earth ground (like a water
pipe) in the laboratory.
5-11
Summary of Contents for Micro-g LaCoste FG5
Page 7: ...Table of Figures This Page is Intentionally Blank vii ...
Page 8: ......
Page 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Page 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Page 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Page 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Page 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Page 56: ......
Page 59: ...Adjustment and Maintenance 4 4 3 ...
Page 78: ...Adjustment and Maintenance 4 4 22 ...
Page 106: ......
Page 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Page 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Page 144: ......