Installation Instructions For:

• Novares
• Plana AT

Summary of Contents for CineTheatre Galleria Curve

Page 1: ...www lpmorgan com au LP Morgan CineTheatre Galleria Curve Manual Installation Instructions For Novares Plana AT ...

Page 2: ...o Galleria LP Morgan and LP Morgan logo are registered trademarks of Herma Technologies Other trademarks and trade names used in this document remain the property of the relevant owners June 2011 Version 1 1 Table of contents To the owner 3 Unpacking 4 5 Assembly instructions 6 Curved Projection Screens 7 Attaching the screen material Novares 8 9 Attaching the screen material Plana AT 10 12 Trimmi...

Page 3: ...y screen uses the finest optical and mechanical components to give you a truly cinematic experience Please take a moment to review this manual as it will ensure you many years of service from your new LP Morgan CineTheatre Galleria Projection Screen Required tools and parts 6 or more screws to suit wall type Screw heads must be no higher than 4mm Spirit level and pencil for marking Electric drill ...

Page 4: ...Screen Novares Supplied parts x 2 Frame Lengths Height x 2 Frame Lengths Width 1 x 4mm Hex Key 1 x Fabric Roll EzyGrip Lengths 2 x EzyMount 1 x 2100 1 x 1400 1 x Cutter 1 x Plastic Drop Sheet Please check that you have all the components before assembly The EzyGrip and EzyMount are packed inside the fabric roll ...

Page 5: ...heck that you have all the components before assembly The EzyGrip and EzyMount are packed inside the fabric roll 1 x EzyMount 1 x Cutter 4 x Frame Sections 1 x Plastic Drop Sheet Insertion Tool 4 x Corner Brackets 1 x 4mm Hex Key Clamping Strip numbered 1 x Fabric Roll EzyGrip Lengths Bracing Bar Screens 140 and larger contain extra components bracing bars ...

Page 6: ...n on a flat surface on the plastic drop sheet provided Please read the instructions carefully to avoid mistakes The corner brackets must be inserted into the lower channel of the frame The grub screws should be accessible through the slot Attach the two curved lengths to one end piece of the frame Fit each mitred corner and bracket into the correct end of the long frames Insert the second end piec...

Page 7: ...he bolts and install the bracing bar spaceing bars evenly across the frame width and re tighten the bolts Bracing bars should be added to the assembled frame prior to attaching the surface Bracing bars are supplied to ensure the frames do not distort when tension is applied to the screen material The assembled screen is placed on the floor arc uppermost and must be supported at the centre of the f...

Page 8: ...along one side of the curved frame then insert another strip of EzyGrip on the opposite side 7 Maintain the pattern of fixing a metre long strip at a time moving one side to the other 8 Pull to tension the fabric at all times but avoid lifting the fabric as the EasyGrip may pop out 9 The bracing bars should be removed only to insert the fabric as it is unrolled 10 Remove each bracing bar to allow ...

Page 9: ...nd apply tension to fabric at the end Insert EasyGrip to secure fabric Avoid lifting up the fabric as the EasYGrip may pop out Then add EasyGrip to the second side Work accross 1 2 4 6 2 1 Stretch and apply tension to fabric at each corner to reduce ripples 2 Avoid lifting up the fabric as the EasyGrip may pop out 3 Apply tension to the fabric with one hand while inserting the EzyGrip with the oth...

Page 10: ...ort length of fabric off the roll as the EzyGrip strips are secured in place 10 Place three cut strips of EzyGrip one side of the curved frame then insert 3 cut strips of EzyGrip on the opposite side 11 Maintain the pattern of fixing 3 strips at a time moving one side to the other pulling and tensioning the fabric at all times 12 Secure lengths of EzyGrip with Clamping Strip to stop it pulling out...

Page 11: ...Stretch and apply tension to fabric at the end Add 300 mm pieces to secure fabric Secure EzyGrip with Clamping Strips Then on the second side add 3 x 300 pieces to the second side Work accross 1st side 3rd side 2nd side Tips 1 Stretch and apply tension to fabric at each corner to reduce ripples 2 Secure EzyGrip with clamping strips 3 Apply tension to the fabric with one hand while inserting the Ez...

Page 12: ...er in size include at least two bracing bars The tabs are already attached to the frame and the bolts are installed on the brace Using the Hex Allen key loosen the bolts install the braces centrally 1300 mm apart then re tighten the bolts If you have ripples or creases in the image area don t panic You can easily remove the EzyGrip retension the surface and re install the EzyGrip ...

Page 13: ...t not to remove the EzyGrip after trimming Trim the excess fabric with the fabric cutter supplied Trimming the screen material Excess Fabric Cutter Slide the cutter along the frame while holding the material Avoid lifitng the fabric Hold the fabric with one hand while sliding the cutter along the inside edge of the frame Avoid lifting up the fabric as the EzyGrip may pop out ...

Page 14: ...les Carefully measure the desired screen position Always use a spirit level as the ceiling or walls may not be square Measure drill and fasten the EzyMount to the wall using at least three screws appropriate to the wall type not supplied When mounting the EzyMount fix securely at 450 600 mm spacing between fixing points over the length The distance between the top and bottom EzyMounts is approxima...

Page 15: ... length 1400 mm The 2100 mm length is used for mounting the top brackets the 1400 mm length can be used to secure the lower bracket The EzyMount supports the screen and allows lateral screen adjustment to align your screen to the projector Check All EzyGrip sections are secured in the correct channel Fabric surface is tensioned All brackets bolts screws are secure ...

Page 16: ...nward ready to hook into the EzyMount slot Lift the screen up and hook the three hanging brackets into the EzyMount slots Ensure you have hooked the screen into both EzyMounts and the screen is secured against the wall Hanging the screen Slide the screen sideways along the EzyMount to line up with the image Make sure the projector is perpendicular to the screen Check Wall brackets are secured at t...

Page 17: ...a sponge or lint free cloth Dab lightly to remove any stubborn marks then blot with a damp sponge to absorb excess water Dab off the detergent with clean water and dry with a soft cloth or towel Do not let the detergent dry on the screen Cleaning your frame If your frame is powder coated or anodised use water with a mild detergent or methylated spirits and a soft cloth to wash off any marks Rinse ...

Page 18: ...mild detergent solution and a sponge or lint free cloth Dab lightly to remove any stubborn marks then blot with a damp sponge to absorb excess water Dab off the detergent with clean water and dry with a soft cloth or towel Do not let the detergent dry on the screen Cleaning your frame If your frame is powder coated or anodised use water with a mild detergent or methylated spirits and a soft cloth ...

Page 19: ...ing installation procedures Herma is not responsible for any freight costs relating to repair or replacement Equipment must be returned to Herma in suitable packing to prevent damage in transit Herma will not accept any responsibility for damage to the equipment caused by inadequate or unsuitable packing or for any damage howsoever caused whilst the goods are in transit Herma Technologies shall no...

Page 20: ... Vic 3072 Phone 61 3 9480 6233 Fax 61 3 9480 6533 Email info herma com au www lpmorgan com au For more information on our range of products please visit www lpmorgan com au or contact your local LP Morgan Retailer June 2011 Version 1 1 ...