4.

IMPORTANT!

Do not let framework stand alone 

until a Back Panel is in place. 

Center Rails must be used.

DETAIL 4a

NOTE:

 Refer to BACK PANEL INFORMATION on page 4 for Center Rail placement.

 

If Telescopic Uprites (TEL) are being installed, the Center Rail must be installed in the third lance (2”) down from the top 

of the Uprite. If used with Uprites 60” through 72” high, a Center Rail must be installed in the third lance down and another 

installed at mid-height of uprite. Bend all tabs outward 

(Detail 4a)

 at each end of the Center Rail.

Slide Base Front

from top or drive

in from front.

Base

Front

Bottom Rail

Base

Front

Center Rail

3rd 

Lance

Bend all

tabs outward

Assemble “framework” of first section by standing first two Uprite/Base Bracket assemblies vertically. 

Connect them by installing Base Fronts, Bottom Rail and Center Rail as shown. 

NOTE: 

 When Wire Grid Backs or Slotwall Backs are to be used, follow instructions packed with Wire Grid Clips or 

Slotwall Center Rail.

3

a

.

With  Uprites  lying  on  floor,  hook  Base 

Bracket  into  narrow  slots  at  bottom  of 

Uprite. Base Bracket will snap into place 

when  properly  installed.  See  suggested 

method above for seating Base Brackets. 

Base  Brackets  are  painted  random 

colors and may not necessarily match 

the color of the Uprites.

Suggested Method for

Seating Base Brackets

TILT-IN BASE BRACKET

3

b

.

Push Bracket fully into Uprite slots, then push down.  

Latch must fully engage Uprite to lock the Bracket 

and Uprite together.  Check latch tabs on both sides 

of Bracket.  Tabs must be at the back of the slot 

in the Bracket.  Refer to page I-4 for removal and 

replacement of the Bracket.

WARNING!  

The shelving system 

may collapse and cause injury if the 

Base Bracket latch is not properly 

engaged with the Uprite.  A properly 

engaged latch tab will be at the back 

of the slot as illustrated.