background image

WIRING: Wiring diagram

MOUNTING: NAC-1

MOUNTING: RC42N

9

13

10

14

11

15

12

16

MOUNTING: Pump-1, Refill oil and bleed system

CORRECT

FLUID LEVEL

MOUNTING: Pump-1, Connect hoses

STB

POR

T

MOUNTING: Bleeding

Turn wheel gently in both directions, and refill oil.
Repeat turning and refilling oil until the oil level is stable and no 

air bubbles left in the transparent tube, and the outboard engine 

responds firmly.
If air bubbles still remain in the system, follow the bleeding procedure 

described for the outboard cylinder.

IMPORTANT: Check hoses for leaks

MOUNTING: Connect hoses to helm pump

CORRECT

FLUID LEVEL

POR

T

STB

STB

POR

T

IMPORTANT: TRANSPARENT HOSE

ECHO

VIDEO IN

NMEA 2K

NETWORK

POWER

ECHO

VIDEO IN

NMEA 2K

NETWORK

POWER

+

_

12 V DC

MAIN 

POWER

SWITCH

 * POINT-1 ONLY

1.2 m

(4 ft)

0.9 m (3 ft)

FUSE,

20 AMP

FUSE,

20 AMP

2 m (6 ft)

1 m (3 ft)

2 m

(3 ft)

2 m

(6 ft)

2 m

(3 ft)

5 m

(15 ft)

0.6 m

(2 ft)

1.8 m (6 ft)

0.9 m (3 ft)

2 m (6 ft)

1 m (3 ft)

5 m

(15 ft)

0.6 m

(2 ft)

1.8 m (6 ft)

ECHO

VIDEO IN

NMEA 2K

NETWORK

POWER

ECHO

VIDEO IN

NMEA 2K

NETWORK

POWER

T

T

+

_

12 V DC

MAIN 

POWER

SWITCH

T

T

 * POINT-1 ONLY

1.2 m

(4 ft)

Optional

Point-1 / RC42N

IMPORTANT: TRANSPARENT HOSE

MOUNTING: GS25/Point-1

Configuration

Refer to your Autopilot controller’s  

documentation for setup instructions.

17

A

C

B

1 * Ø 19 mm (0.75”)

2 * Ø 3 mm (0.12”)

SIMRAD

Note the mounting

direction!

LOWRANCE

D

    1

    2

    3

    4

www.busse-yachtshop.de  |  [email protected]

Reviews: