WIRING: Wiring diagram
MOUNTING: NAC-1
MOUNTING: RC42N
9
13
10
14
11
15
12
16
MOUNTING: Pump-1, Refill oil and bleed system
CORRECT
FLUID LEVEL
MOUNTING: Pump-1, Connect hoses
STB
POR
T
MOUNTING: Bleeding
Turn wheel gently in both directions, and refill oil.
Repeat turning and refilling oil until the oil level is stable and no
air bubbles left in the transparent tube, and the outboard engine
responds firmly.
If air bubbles still remain in the system, follow the bleeding procedure
described for the outboard cylinder.
IMPORTANT: Check hoses for leaks
MOUNTING: Connect hoses to helm pump
CORRECT
FLUID LEVEL
POR
T
STB
STB
POR
T
IMPORTANT: TRANSPARENT HOSE
ECHO
VIDEO IN
NMEA 2K
NETWORK
POWER
ECHO
VIDEO IN
NMEA 2K
NETWORK
POWER
+
_
12 V DC
MAIN
POWER
SWITCH
* POINT-1 ONLY
*
1.2 m
(4 ft)
0.9 m (3 ft)
FUSE,
20 AMP
FUSE,
20 AMP
2 m (6 ft)
1 m (3 ft)
2 m
(3 ft)
2 m
(6 ft)
2 m
(3 ft)
5 m
(15 ft)
0.6 m
(2 ft)
1.8 m (6 ft)
0.9 m (3 ft)
2 m (6 ft)
1 m (3 ft)
5 m
(15 ft)
0.6 m
(2 ft)
1.8 m (6 ft)
ECHO
VIDEO IN
NMEA 2K
NETWORK
POWER
ECHO
VIDEO IN
NMEA 2K
NETWORK
POWER
T
T
+
_
12 V DC
MAIN
POWER
SWITCH
T
T
* POINT-1 ONLY
*
1.2 m
(4 ft)
Optional
Point-1 / RC42N
IMPORTANT: TRANSPARENT HOSE
MOUNTING: GS25/Point-1
Configuration
Refer to your Autopilot controller’s
documentation for setup instructions.
17
A
C
B
1 * Ø 19 mm (0.75”)
2 * Ø 3 mm (0.12”)
SIMRAD
Note the mounting
direction!
LOWRANCE
D
1
2
3
4
www.busse-yachtshop.de | [email protected]