![LOWES Crescent Hill Assembly Instructions Download Page 1](http://html1.mh-extra.com/html/lowes-0/crescent-hill/crescent-hill_assembly-instructions_1942684001.webp)
IMPORTANT NOTE
Carefully remove all the parts from the carton and put
them individually on a soft cloth to prevent scratches
or other damage occurring to the parts.
We have taken great care in the design of this
product and request that you carefully and strictly
follow our assembly instructions to ensure a
completed product as it was designed.
Part List
Home Styles Consumer Assistance: www.homestyles-furniture.com,
[email protected], 888-680-7460, 877-831-0319
Hardware List
88 5549 101
Crescent Hill
Entertainment Credenza
For assembly see instructions in carton 88 5549 102
Tools required for assembly : Phillips screwdriver
Tools recommended for assembly : Level
Small Hex Wrench
1 Pc.
Hex Wrench
1 Pc.
Cam Lock
12 Pcs. (+4 extra)
Head Cap Bolt (short)
4 Pcs. (+1 extra)
Flat Washer
8 Pcs. (+1 extra)
Tapered Wood Screw
4 Pcs. (+1 extra)
Wood Screw
12 Pcs. (+1 extra)
Spring Washer
8 Pcs. (+1 extra)
Pull Handle
2 Pcs.
Magnet
2 Pcs.
Machine Screw
4 Pcs.
Adjustable Pin
24 Pcs.
Head Cap Bolt (long)
8 Pcs. (+1 extra)
M6x25
M4x25
M3x15
M3x15
M6x50
Cam Lock Screw
12 Pcs. (+1 extra)
A.
Top
1 Pc.
I.
Shelf
4 Pcs.
J.
Door
1 Pc.
K.
Door
1 Pc.
L.
Base
1 Pc.
M.
Leg
1 Pc.
N.
Leg
1 Pc.
O.
Leg
1 Pc.
P.
Leg
1 Pc.