©2021 Lowell Manufacturing Co. | X-Rev.10-21-21
5
2-3: Selecting installation position
It is necessary to select a proper environment to install the unit, to minimize the possibility of damage to the
battery box and extend the life of the batteries. Please follow the instructions below:
•
Keep at least 20cm (8 inches} clearance from the rear panel of the unit from the wall or other
obstructions.
•
Do not block the airflow to the ventilation openings of the unit.
•
Please ensure the installation site environmental conditions are in accordance with the unit's working
specifications to avoid overheat and excessive moisture.
•
Do not place the unit in a dusty or corrosive environment or near flammable objects.
•
This unit is not designed for outdoor use.
This unit can either be mounted or placed vertically on the desk.
Rack installation:
Step 1:
Mount the 4-point rail kit to the rack. Use the (8) 10-32 screws provided to mount left and right support
rails (front and rear).
Step 2:
Attach the mounting brackets to the UPS.
CAUTION
—DO NOT use mounting brackets to lift the UPS;
brackets are only to secure it to the rack.
Step 3: Place UPS on the support rails and secure in place with front screws, allowing the horizontal rails to
support the weight of the UPS.