10.2 Starting the Pump
(1) Make sure that an unhindered water flow is possible
and not blocked, e.g. by closed valves.
(2) Switch on the PV generator disconnect switch.
(3) Toggle the power switch on the controller to ON.
A solar-direct pump will now start when sufficient irra-
diation levels are reached and neither the well probe,
remote switch or a PumpScanner setting prevent the
controller from starting the pump.
10.3 Time Delays
Event
Time delay
Pump stops due to
insufficient irradiation
120 seconds
Remote switch resets
2 - 3 seconds
Low water well probe
regains contact with water
15 Minutes
Shutdown due to
overtemperature
Automatic restart after
cooling down
Shutdown due to overload
Manual reset of POWER
switch necessary
To force a quick start
, the above listed delays can be by-
passed by switching the POWER switch OFF/ON. The pump
should now start immediately if sufficient power is present.
68
Operating the Pump
Summary of Contents for CS-17-1
Page 2: ......
Page 3: ...ENGLISH...
Page 77: ...Troubleshooting 75...
Page 78: ......
Page 79: ...FRAN AIS...
Page 153: ...D pannage 75...
Page 154: ......
Page 155: ...ESPA OL...
Page 229: ...Resoluci n de problemas 75...