11
6.Install Teflon tube
Let the lead screw snap into the
coupling and the motor shaft is also
aligned with the lead screw. Tighten
the top wire
Adjust the screw movement by
adjusting these two screws. The two
screws cannot be tightened too tightly.
Turn the coupling by hand to adjust
the movement of the lead screw.
note
Teflon tube and
line direction
Summary of Contents for LK2
Page 1: ...zz...
Page 7: ...5 4 Machine assembly Upper packaging Lower packaging Assembled...
Page 10: ...8 Box side up...
Page 11: ...9 The tension of the belt can be adjusted by the two screws on the box...
Page 16: ...14 Next to the z axis motor profile Next to the power profile The cable tie can t be too tight...
Page 17: ...15 11 Mounting rack and glass 12 Assembly completed...
Page 22: ...20 C Cura installation and operation software...
Page 23: ...21...
Page 24: ...22...
Page 25: ...23 1 Slice software offline printing instructions...
Page 26: ...24...
Page 27: ...25...