background image

Fig. 4 - Monitoring Schematic

Fig. 4 - Monitoring Schematic

Solenoid Wiring

Solenoid Return (0V)

Red

Black

Solenoid Power 

(10-30V DC)

100-300mA

Common

N.O. (Normally Open)

Yellow

Violet

Brown

N.C. (Normally Closed)

Latch Monitor Wiring

Door Opened

Solenoid Monitor Wiring: 

Unpowered

Common

N.C. (Normally Closed)

Grey

Orange

White

N.O. (Normally Open)

ELECTRICAL SPECIFICATION

Door mounting bracket

Refit strike and secure, making sure no wires are being crushed.

Check both mechanical and electronic operation works correctly.

CHECKING FUNCTION

6

TUBULAR LATCH OPERATION
To ensure deadlatching, ensure 
that the deadlatching pin is 
depressed by the edge of the 
keeper when the door is closed.

Deadlatching
pin.

Keeper
edge.

CAUTION! Incorrect supply voltage may cause damage not covered by warranty.  

Please check supply voltage with a suitable meter to ensure it is within 10-30V DC. 

Current required is  250mA @12V DC to 130mA @ 24V DC

DO NOT OIL OR LUBRICATE.

9000 Series Microswitch Monitoring

The 9000 Series Electric Strike has back EMF protection built into the product. 
No external protection diode is required.

The wiring diagram for the monitoring schematic is shown in Fig. 4 and on the 
back of the strike.

5 Year Limited Warranty

ASSA ABLOY Australia guarantees for a period of 5 years in accordance with Trimec’s 
Standard Warranty Conditions, against defects in manufacture, workmanship or materials, 
provided that all electrical and mechanical installation requirements are adhered to as per 
this datasheet. All third party and consequential claims are expressly excluded from 
the warranty.

2

  5mm Extension lip

50mm Extension lip 

75mm Extension lip 

P/No. 220200-505

The installation of a Strike guard is recommended on outward opening 
external doors.

P/No. 220200-506

P/No. 220200-507

warranty

4 Hr 

FIRE RATED

ASSEMBLING STRIKE

5

For metal door frames fit door mounting brackets.
Once door frame preparation is complete, temporarily fit strike into 
door frame to check for interference. Check that the door closes
smoothly and that the latch extends fully past the strike keeper.
When strike operates correctly with latch, remove strike from 
mortice and connect wiring. 

Ensure wires come out 
of back as shown

Reviews: