Carrier 30 Cart and Carrier 40 Cart
Run the cable up through the hole at the end.
Press a finger into the Gripweld to create
a pull-hole.
Replace the shelves.
Pull the cable through the Gripweld.
Slide the cable along adjacent to the device.
Insert the remaining cables.
Evenly space the cables along the Gripweld.
NOTE: There are 3 positions the shelves can be
inserted. Insert the shelves at the height that suits
your devices.
For smaller devices choose the highest position.
For large devices choose the lowest position.
Small devices level.
Large devices level.
Replace the Carry Baskets with the devices
installed.
Insert all the device adaptors into the power
strips.
Summary of Contents for Carrier 30 Cart
Page 8: ...www pclocs com au www lockncharge com...
Page 16: ...www pclocs com au www lockncharge com...
Page 24: ...www pclocs com au www lockncharge com...
Page 32: ...www pclocs com au www lockncharge com...
Page 40: ...www pclocs com au www lockncharge com...
Page 48: ...www pclocs com au www lockncharge com...