40
6
Hydronic piping
DIR #2000559502 01
INDIRECT
DHW
TANK
BOILER 1
(LEADER)
T P
MAKE UP
WATER
P
TO
SYSTEM
FROM
SYSTEM
LEGEND
AIR SEPARATOR
CIRCULATION
PUMP
FLOW CHECK VALVE
PRESSURE GAUGE
P
TEMPERATURE &
PRESSURE GAUGE
T P
SYSTEM SUPPLY
SENSOR
BACKFLOW
PREVENTER
MAGNETIC SEPARATOR
WATER METER
STRAINER / FILTER
PRESSURE
REDUCING VALVE
PRESSURE RELIEF
VALVE
BALL VALVE
EXPANSION TANK
PIPING
DRAIN PORT
DIFFERENTIAL
PRESSURE
BYPASS VALVE
2 WAY MOTORIZED
VALVE (OPTIONAL)
MIXING VALVE
ANTI SCALD
FLOW SWITCH
OPTIONAL
WIRING
BOILER 2
T P
BOILER 3
T P
BOILER 4
T P
MAY SUBTITUTE
LOW LOSS HEADER
NOT TO EXCEED 4 PIPE DIA OR
MAX OF 12” APART
COLD
WATER IN
DHW HOT
WATER OUT
Figure 6-9
Multiple Boilers - Primary/Secondary Piping
NOTICE
System flow should always remain higher than the required flow for the boiler(s) when the boiler(s) is in
operation to prevent short cycling and high limit issues.
Please note that these illustrations are meant to show system piping concept only, the installer is responsible
for all equipment and detailing required by local codes. Connection locations shown are for reference only
and will vary with boiler type.
NOTICE
CAUTION
Indirect water heaters are capable of transferring a limited number of Btu’s into the water. Ensure boiler
output does not exceed indirect water heater transfer capabilities.
Installation & Operation Manual
Model
Number of Units
2
3
4
5
6
7
8
Manifold Pipe Sizes in Inches (mm)
1000
4 (102)
5 (127)
6 (152) 8 (203) 8 (203) 8 (203) 10 (254)