31
10.16
C
53
(TWIN PIPE) FLUE SYSTEMS
Flue system specifications
MANUFACTURER MUELINK AND GROL (M&G)
TEMPERATURE CLASS T120
FLUE GAS MATERIAL PP
Each Twin-Pipe starter assembly includes the items shown in the tables below, you then add either the Vertical or Horizontal terminal and air
inlet.
Item No
SHTF003
TWIN-PIPE FLUE STARTER ASSEMBLY MODELS
SHW35-245,SHW46-325,SHW61-325
COMPONENTS INCLUDED WITHIN KIT TO START INSTALLATION
Item No.
Description
Included
M75256
AIR INLET TRANSITION Ø80mm ALU
1
M85279
SAMPLING POINT Ø80mm PP
1
VERTICAL FLUE
M86864
CONCENTRIC VERTICAL TERMINAL Ø80/125mm PP
LV305016
HORIZONTAL AIR INLET Ø80mm
HORIZONTAL FLUE
M86934
CONCENTRIC HORIZONTAL TERMINAL Ø80/125mm PP (NO WALL PLATES)
LV305016
HORIZONTAL AIR INLET Ø80mm
M28925
TERMINAL WALL PLATES (PAIR)
Item No
SHTF004
TWIN-PIPE FLUE STARTER ASSEMBLY MODELS
SHW86-410,SHW116-410,SHW146-410
COMPONENTS INCLUDED WITHIN KIT TO START INSTALLATION
Item No.
Description
Included
M75257
AIR INLET TRANSITION Ø100mm ALU
1
M85189
SAMPLING POINT Ø100mm PP
1
VERTICAL FLUE
LV310754
CONCENTRIC VERTICAL TERMINAL Ø100/150mm PP
LV305039
HORIZONTAL AIR INLET Ø100mm ALU
HORIZONTAL FLUE
M86934
CONCENTRIC HORIZONTAL TERMINAL Ø80/125mm PP (NO WALL PLATES)
LV305039
HORIZONTAL AIR INLET Ø100mm ALU
M28925
TERMINAL WALL PLATES (PAIR)
When installing EcoShield™ on a C
53
twin pipe flue system, the Lochinvar Twin pipe flue starter assembly must be fitted first.
Summary of Contents for EcoShield SHW116-410CE
Page 2: ...2 ...
Page 9: ...9 EXPLODED VIEW DRAWINGS ...
Page 27: ...27 Max distance between brackets ...
Page 28: ...28 ...
Page 29: ...29 ...
Page 34: ...34 ...
Page 47: ...47 13 9 LADDER DIAGRAM LADDER DIAGRAM ...
Page 71: ...71 NOTES ...
Page 72: ...72 N ...