6
OM
-
DMP
-
1000 REV: B
OPERATORS MANUAL
When using a Load King Dump Body, it is important to have a good understanding of the proper pre
-
Inspection, post
-
inspections, and operating guidelines. By following these steps, you can safely oper-
ate the Load King Dump Body with minimal risks of damage to the machine or the surrounding prop-
erty.
Pre
-
Use Inspection
1.
Before using a Load King Dump Body, do a 360 degree walk around to visually inspect that the dump bed
will be free of obstructions once in operation.
2.
Be sure to check the oil sight gauge on the reservoir to ensure the tank is full and that no oil has leaked
out.
3.
Visually inspect all critical fasteners to ensure there are no loose or damaged bolts, nuts, or other hard-
ware. Ensure that all lubrication points have been well maintained and lubricated.
4.
If any damage to body or hardware is observed, do not operate until a thorough inspection has been con-
ducted and all necessary repairs have been made.
Proper Operation Sequence
DANGER:
Choose an operating location where the bed can be fully raised without approaching
power lines.
To dump:
1.
Position the chassis on level ground, away from potential hazards such as power lines and traffic.
2.
Turn on the chassis engine, set the parking brake, and engage the PTO switch located on the center dash
panel.
3.
If the unit is equipped with a tarper system, always ensure the tarp is fully retracted and stowed before
dumping.
4.
WARNING:
When raising a loaded dump body, always release the tailgate pins BEFORE raising
the body. The tailgate pins should never be released with a load against the tailgate.
5.
DANGER:
Before operating the dump body, ensure all bystanders are kept well away from the
area of operation. Do not allow anyone to stand behind loaded dump body. Do not operate in high
traffic areas. Operator must stay at controls through entire dumping process, away from all mov-
ing parts, and shielded from road traffic or other potential hazards.
6.
Use the “Up” lever to raise dump bed to upright position and dump cargo.
Summary of Contents for LK10DB 2019
Page 1: ...OPERATORS MANUAL LOAD KING 10 DUMP BODY...
Page 2: ...2 OM DMP 1000 REV B...
Page 9: ...9 OM DMP 1000 REV B LOAD KING DUMP BODY LABELS 1 6 1 2 2 3 5 4 7...
Page 10: ...10 OM DMP 1000 REV B LOAD KING DUMP BODY LABELS 1 2 3 4 5...
Page 16: ...16 OM DMP 1000 REV B...
Page 17: ...Load King PO Box 427 Elk Point South Dakota USA 57025 0427 Toll Free 888 264 5522...
Page 18: ......