background image

IOMVIFB-8

4830 TRANSPORT DRIVE, DALLAS TX 75247

TEL.: (214) 638-6010

www.ljwing.com 

WARNING: Improper installation, adjustment, alteration, service or maintenance 

can cause property damage, injury or death. Read the installation, operating and 

maintenance instructions thoroughly before installing or servicing this equipment.  

INSTALLER'S RESPONSIBILITY

Installer Please Note: This equipment has been test fired and inspected.  It has been shipped 

free from defects from our factory.  However, during shipment and installation, problems such as 

loose wires, leaks or loose fasteners may occur.  It is the installer’s responsibility to inspect 

and correct any problems that may be found.

ATTENTION: READ CAREFULLY BEFORE ATTEMPTING TO INSTALL, OPERATE OR SERVICE THIS 

EQUIPMENT. RETAIN FOR FUTURE REFERENCE.

POST AND MAINTAIN THESE INSTRUCTIONS IN LEGIBLE CONDITION.

INSTALLATION, OPERATION AND

MAINTENANCE MANUAL

VERTICAL TUBE HEATING COILS 

MV & VIFB MODELS

SAVE THIS MANUAL

ATTENTION: READ THIS MANUAL AND ALL LABELS ATTACHED TO THE UNIT CAREFULLY BEFORE 
ATTEMPTING TO INSTALL, OPERATE OR SERVICE THESE UNITS! CHECK UNIT DATA PLATE FOR 
STEAM OR HOT WATER REQUIREMENTS AND ELECTRICAL SPECIFICATIONS AND MAKE CERTAIN 
THAT THESE AGREE WITH THOSE AT POINT OF INSTALLATION. RECORD THE UNIT MODEL AND SE-
RIAL No.(s) IN THE SPACE PROVIDED.  RETAIN FOR FUTURE REFERENCE. THE APPLIANCE IS NOT 
TO BE USED BY PERSONS (INCLUDING CHILDREN) WITH REDUCED PHYSICAL, SENSORY OR MEN-
TAL CAPABILITIES, OR LACK OF EXPERIENCE AND KNOWLEDGE, UNLESS THEY HAVE BEEN GIVEN 
SUPERVISION OR INSTRUCTION. CHILDREN SHOULD BE SUPERVISED TO ENSURE THAT THEY DO 
NOT PLAY WITH THE APPLIANCE.

WING Model No.   

 

 

 

 

Serial No.

Wing MV & VIFB coil performance 

is certified by the Air-Conditioning, 

Heating, and Refrigeration Institute 

(AHRI) under AHRI Standard 410 

for maximum working pressures 

up to 200 PSIG and temperatures 

up to 400° F.

Wing MV & VIFB coils are listed 

by Engineering Test Laboratories 

(ETL) to Underwriter Laboratories 

(UL) Standard 1995. This 

standard assures that Wing coils 

are safe to operate up to a design 

pressure of 100 PSIG. 

Summary of Contents for MV

Page 1: ...ELS SAVE THIS MANUAL ATTENTION READ THIS MANUAL AND ALL LABELS ATTACHED TO THE UNIT CAREFULLY BEFORE ATTEMPTING TO INSTALL OPERATE OR SERVICE THESE UNITS CHECK UNIT DATA PLATE FOR STEAM OR HOT WATER REQUIREMENTS AND ELECTRICAL SPECIFICATIONS AND MAKE CERTAIN THAT THESE AGREE WITH THOSE AT POINT OF INSTALLATION RECORD THE UNIT MODEL AND SE RIAL No s IN THE SPACE PROVIDED RETAIN FOR FUTURE REFERENCE...

Page 2: ...ipment require no additional conduit or wire for field reassembly All wire leads will be tagged for ease of reconnection in the field Shipments are made F O B Dallas Texas The unit is securely strapped tied and blocked to prevent shipping damage All shipments are checked by an inspector before they are accepted by the carrier Parts that are shipped unmounted are noted on the bill of lading These p...

Page 3: ...mounting bracket to prevent damage to the header and tubes during shipment See Figure 1 Shipping bolts must be removed before applying steam or hot water but after all piping connections are made Failure to do so will void factory warranty Figure 1 Shipping Bolt Locations C 000703 F Remove shipping braces before attaching ductwork G Ductwork can be attached to the coil flanges or the coil can stan...

Page 4: ...nate airflow over the supply and return headers by installing sheet metal isolation plates on the top and bottom upstream of the coils b Inlet and outlet mains should be fully insulated c To eliminate coil temperature override use slow acting on off valves to close at desired set points d The installation of humidifiers with steam manifolds internal of an air handler may provide a temperature over...

Page 5: ...e coil resulting in poor downstream temperature control B Turning vanes must be used to assure even distribution of air over the entire coil where elbows are used in the inlet and or outlet side of a preheat coil See Figure 6 C When the coil is used as a preheat coil in conjunction with a cooling coil located downstream of the heating coil a minimum space of 36 should be allowed between this coil ...

Page 6: ... 6 SECTION V EQUIPMENT PHOTOS Photo of Indirect Coupled VIFB Entering Air Side Photo of Indirect Coupled VIFB Leaving Air Side ...

Page 7: ... 7 Photo of Direct Coupled VIFB Entering Air Side Photo of Direct Coupled VIFB Leaving Air Side ...

Page 8: ... 8 SECTION VI PARTS DRAWING Enlarged View C Section A A Section D D Elevation ...

Page 9: ...ing Bar 8 Side Panel 9 Snap Bushing 10 Return Header 11 Casing Support Channel 12 Optional Weather Proof Control Housing 13 Drive Assembly 14 Top and Bottom Panel 15 Bearing Nylon 16 Washer Special 17 Finned 5 8 Tube 18 Damper 19 Washer 1 O D 20 Palnut Fastener 21 Plain Washer 3 16 22 Rivet Brass 23 Damper Rod 24 Bearing Nylon 25 Washer 1 2 26 Retaining Clip 27 Shipping Bolts to be removed before ...

Page 10: ...corporate a flexible connector to provide for at least 3 8 tube expansion and contraction and to allow the return header to float The integrity of the system depends in part on proper piping The following recommendations should be diligently observed Steam Systems 1 All piping in contact with airflow or inside an air hander should be insulated 2 Install casing level tubes must be vertical 3 Full s...

Page 11: ... 11 STEAM PIPING VIFB Coil Piping Diagram 15 psig and below W12A ...

Page 12: ... 12 STEAM PIPING VIFB Coil Piping Diagram Above 15 psig W33B ...

Page 13: ... 13 HOT WATER PIPING VIFB Coil Piping Diagram One or Three Row Coils W13B ...

Page 14: ... 14 HOT WATER PIPING VIFB Coil Piping Diagram Two Row Coil W32B ...

Page 15: ... 15 STEAM PIPING MV Coil Piping Diagram 15 psig and below W27A ...

Page 16: ... 16 STEAM PIPING MV Coil Piping Diagram Above 15 psig W28A ...

Page 17: ... 17 HOT WATER PIPING MV Coil Piping Diagram Two Row Coil W29A ...

Page 18: ...cated in the downstream ductwork a minimum of 3 ft away from the coil The thermostat element must be positioned across both face and by pass sections of the coil parallel to the header C Control installation instructions including diagrams are enclosed in the instruction envelope when special controls and control arrangements are ordered Typical electric and pneumatic control arrangements are indi...

Page 19: ... 19 ELECTRIC AND PNEUMATIC CONTROLS D000756A ...

Page 20: ...hten ball joints one on each arm connecting scissor saddle base pan arms to damper lever arm 7 With assembly now set release clamps and rotate damper lever arm until it reaches a point 1 1 2 from casing and clamp in this position Photo 3 8 Manually check to make sure that all dampers are fully closed around the coil 9 Tighten ball joints two on each side connecting base assembly to dampers 10 Remo...

Page 21: ...3 Open steam supply line to coil and blow through coil with steam to purge coil of air and condensate 4 Feel tube surfaces to assure even heating of all surfaces before starting fans or opening outside shutoff dampers 5 Allow unit to heat soak at least 15 minutes as in step 4 6 Open dampers on the heating surface all the way by adjusting thermostats or control air pressure to units 7 Open outside ...

Page 22: ...its and allow water to drain E Do not expose a coil which has been shut down to sub freezing air flow as water droplets in tubes may freeze resulting in coil freeze up when coil is restarted See starting instructions SECTION XI MAINTENANCE A The Wing heating coil should be periodically inspected for continuous satisfactory operation Loose nuts bolts screws and damper linkage should be tightened Cr...

Page 23: ... 23 ...

Page 24: ...4830 TRANSPORT DRIVE DALLAS TX 75247 TEL 214 638 6010 www ljwing com ...