![LIVOLTEK GT3-50K User Manual Download Page 14](http://html1.mh-extra.com/html/livoltek/gt3-50k/gt3-50k_user-manual_1931326014.webp)
11
4 Installation
4 1 Checking the Outer Packing
.
a
When receiving the inverter check that the packing materials are intact
.
,
.
.
,
,
,
b
After unpacking check that the deliverables are complete intact and consistent with your
order list.
c
Examine the PV inverter and its fittings for damage such as scraps and cracks
.
.
Do not install the inverter on flammable building materials or in an
area that stores flammable or explosive materials
.
Do not install the inverter in a place where personnel are likely to
come into contact with its enclosure and heat sinks to avoid electrical
shock/burn
.
Figures 4 1 The deliverables: The inverter and its fittings
.
CAUTION
DANGER
H
G
Items
Deliverables
The inverter
Rear panel
File package
DC terminal connector group 50K(10*2) 60K(12*2)
M6 screw
Bolt group (including screw, nut)*3
(reserved for tightening the support and rear panel)
Insulated end sleeve terminals
Removal tool for DC connectors
G
H
Summary of Contents for GT3-50K
Page 1: ...GT3 50K 60K Ver 00...
Page 43: ......